ON THE SCHEDULING OF A JOBSHOP BY SIMULATION

被引:0
|
作者
ELKADEEM, M [1 ]
ISSA, SS [1 ]
FORS, MN [1 ]
机构
[1] UNIV ALEXANDRIA,ALEXANDRIA,EGYPT
关键词
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
引用
收藏
页码:189 / 189
页数:1
相关论文
共 50 条
  • [1] MULTICRITERIA JOBSHOP SCHEDULING
    RAMESH, R
    CARY, JM
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1989, 17 : 597 - 602
  • [2] Modeling uncertainty in jobshop scheduling
    Luh, PB
    Chen, D
    Thakur, LS
    [J]. FIRST INTERNATIONAL CONFERENCE ON OPERATIONS AND QUANTITATIVE MANAGEMENT, VOL 1 AND 2, 1997, : 490 - 497
  • [3] Simulation optimization for a flexible jobshop scheduling problem using an estimation of distribution algorithm
    20142717883302
    [J]. Pérez-Rodríguez, R. (rperez.picyt@ciatec.mx), 1600, Springer London (73): : 1 - 4
  • [4] Simulation optimization for a flexible jobshop scheduling problem using an estimation of distribution algorithm
    Ricardo Pérez-Rodríguez
    S. Jöns
    Arturo Hernández-Aguirre
    Carlos Alberto-Ochoa
    [J]. The International Journal of Advanced Manufacturing Technology, 2014, 73 : 3 - 21
  • [5] Simulation optimization for a flexible jobshop scheduling problem using an estimation of distribution algorithm
    Perez-Rodriguez, Ricardo
    Joens, S.
    Hernandez-Aguirre, Arturo
    Alberto-Ochoa, Carlos
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 73 (1-4): : 3 - 21
  • [6] Fuzzy modelling applied to jobshop scheduling
    Lowndes, V
    Carter, JM
    Wu, MH
    Berry, S
    [J]. ESM 2003: 17TH EUROPEAN SIMULATION MULTICONFERENCE: FOUNDATIONS FOR SUCCESSFUL MODELLING & SIMULATION, 2003, : 589 - 594
  • [7] SCHEDULING OF MATERIAL HANDLING VEHICLES IN A JOBSHOP ENVIRONMENT
    WILSON, HG
    EZZAT, MO
    [J]. LOGISTICS AND TRANSPORTATION REVIEW, 1984, 20 (04): : 517 - 526
  • [8] Research on Jobshop Scheduling Problem with Energy Consumption
    Wang, Jiahai
    Gong, Wentao
    [J]. ADVANCED MANUFACTURING TECHNOLOGY, PTS 1-3, 2011, 314-316 : 2071 - 2075
  • [9] Jobshop scheduling with imprecise durations: A fuzzy approach
    Fortemps, P
    [J]. IEEE TRANSACTIONS ON FUZZY SYSTEMS, 1997, 5 (04) : 557 - 569
  • [10] Heuristics for scheduling operations in MRP: Jobshop case
    Ho, JC
    Chang, YL
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2005, 12 (04): : 322 - 334