共 50 条
- [42] SELECTED DESIGN AND CONSTRUCTION ASPECTS OF THE SELBY COALFIELD PROJECT - DISCUSSION [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1985, 78 (APR): : 379 - 387
- [43] Construction of North East Line tunnels at Singapore River Crossing [J]. TUNNELS AND UNDERGROUND STRUCTURES, 2000, : 191 - 198
- [44] AN EAST-COAST CALIBRATION LINE WITH THE GULF-WISCONSIN QUARTZ PENDULUMS [J]. JOURNAL OF GEOPHYSICAL RESEARCH, 1960, 65 (08): : 2520 - 2520
- [45] Approved investments of 274.4 million euros in the high speed line to the east coast [J]. Revista de Obras Publicas, 2009, 156 (3505): : 72 - 73
- [46] The Software Curriculum Group Construction Practice with the Curriculum Design as the Main Line [J]. INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT AND APPLIED SOCIAL SCIENCE (EMASS 2016), 2016,
- [47] ECOLOGICAL AND MEDICAL CONDITIONS OF THE CONSTRUCTION OF THE AMUR-YAKUTSK MAIN LINE [J]. SOTSIOLOGICHESKIE ISSLEDOVANIYA, 1994, (07): : 83 - 85
- [48] THE CONSTRUCTION OF THE MAIN LINE OF THE BAIKAL-AMUR RAILROAD - HISTORIOGRAPHY OF THE PROBLEMS [J]. ISTORIYA SSSR, 1987, (01): : 123 - 136