Construction of North East Line tunnels at Singapore River Crossing

被引:0
|
作者
Sebastian, P [1 ]
Nadarajah, P [1 ]
机构
[1] Land Transport Author, Singapore, Singapore
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction of a twin 70 m long North East Line tunnels, under the Singapore River, was the second such crossing of the MRT system under the Singapore River. The Singapore River Crossing work was identified as a high-risk operation mainly because as the cover to the river bed was only 10m, any blow out or sudden ground loss could cause the tunnels to be inundated with sea-water causing a serious set-back to the North East Line Project. The presence of a transition zone where the ground changes from hard weathered sandstone to soft marine clay midway through the tunnel route, increased the potential for a blow-out or cave-in. This paper briefly describes these challenges that had to be overcome in the construction phase of the Singapore River crossing.
引用
收藏
页码:191 / 198
页数:8
相关论文
共 50 条
  • [1] Singapore North East line project
    Alstom Transport, Systems Business, 23, Avenue de la République, 92506 Rueil-Malmaison Cedex, France
    [J]. Committee on Automated People Movers; of the Urban Transportation Division, 1600, (2004):
  • [2] Design of the civil works for Singapore's North East line
    Krishnan, R
    Copsey, JP
    Algeo, RG
    Shirlaw, JN
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1999, 14 (04) : 433 - 448
  • [3] Design of the civil works for Singapore's North East line
    Krishnan, R.
    Copsey, J.P.
    Algeo, R.G.
    Shirlaw, J.N.
    [J]. Tunnelling and Underground Space Technology, 14 (04): : 433 - 448
  • [4] Construction of Rail Tunnels Using Slurry Machines on Circle Line Stage 3, Singapore
    Peng, Seah Tiong
    Ariaratnam, Kulaindran
    Nam, Ow Chun
    [J]. 11TH ACUUS INTERNATIONAL CONFERENCE - UNDERGROUND SPACE: EXPANDING THE FRONTIERS, 2007, : 99 - 105
  • [5] Risk analysis and control in the Yellow River-crossing tunnel of South-to-North Water Diversion East Line
    Liu Bo
    Wang You-zhi
    Niu Meng-ting
    [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2655 - 2658
  • [6] ANOTHER EAST RIVER CROSSING
    RICCIO, LJ
    [J]. EAST RIVER TIDAL BARRAGE: A SYMPOSIUM ON A MULTIPURPOSE ADDITION TO NEW YORK CITY'S INFRASTRUCTURE, 1994, 742 : 93 - 97
  • [7] Design and Construction Challenges for a Transmission Line and Structures Crossing a River for Bridge Relocation
    Shanmugasundaram, Rengaswamy
    Ford, W. Greg
    Calvert, Rodger
    [J]. ELECTRICAL TRANSMISSION AND SUBSTATION STRUCTURES 2015: TECHNICAL CHALLENGES AND INNOVATIVE SOLUTIONS IN GRID MODERNIZATION, 2015, : 500 - 511
  • [8] Foundation Design and Construction Challenges at River Crossing for 345 kV Transmission Line
    Karels, Lucas D.
    [J]. 2014 IEEE PES T&D CONFERENCE AND EXPOSITION, 2014,
  • [9] Constructing the cut-and-cover tunnels and bored tunnels of the Singapore Downtown Line
    [J]. 1600, Southeast Asian Geotechnical Society (48):
  • [10] Bridge construction of Malaysia-Singapore second crossing
    Kikura, M
    Mito, S
    Ono, H
    [J]. 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 388 - 393