共 50 条
- [1] Singapore North East line project [J]. Committee on Automated People Movers; of the Urban Transportation Division, 1600, (2004):
- [3] Design of the civil works for Singapore's North East line [J]. Tunnelling and Underground Space Technology, 14 (04): : 433 - 448
- [4] Construction of Rail Tunnels Using Slurry Machines on Circle Line Stage 3, Singapore [J]. 11TH ACUUS INTERNATIONAL CONFERENCE - UNDERGROUND SPACE: EXPANDING THE FRONTIERS, 2007, : 99 - 105
- [5] Risk analysis and control in the Yellow River-crossing tunnel of South-to-North Water Diversion East Line [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2655 - 2658
- [6] ANOTHER EAST RIVER CROSSING [J]. EAST RIVER TIDAL BARRAGE: A SYMPOSIUM ON A MULTIPURPOSE ADDITION TO NEW YORK CITY'S INFRASTRUCTURE, 1994, 742 : 93 - 97
- [7] Design and Construction Challenges for a Transmission Line and Structures Crossing a River for Bridge Relocation [J]. ELECTRICAL TRANSMISSION AND SUBSTATION STRUCTURES 2015: TECHNICAL CHALLENGES AND INNOVATIVE SOLUTIONS IN GRID MODERNIZATION, 2015, : 500 - 511
- [8] Foundation Design and Construction Challenges at River Crossing for 345 kV Transmission Line [J]. 2014 IEEE PES T&D CONFERENCE AND EXPOSITION, 2014,
- [9] Constructing the cut-and-cover tunnels and bored tunnels of the Singapore Downtown Line [J]. 1600, Southeast Asian Geotechnical Society (48):
- [10] Bridge construction of Malaysia-Singapore second crossing [J]. 15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, PROCEEDINGS, 1998, : 388 - 393