共 50 条
- [31] THE RESULTS OF IMPROVEMENT IN THE SLAB CASTERS IN NO-2 STEELMAKING SHOP AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .3. IMPROVEMENT OF TUNDISH SERVICE YARD [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S155 - S155
- [32] TECHNICAL DEVELOPMENT IN CONTINUOUS ANNEALING LINE AT MIZUSHIMA WORKS .3. CHARACTERISTICS OF PROPERTIES ON DRAWABLE COLD ROLL SHEET PRODUCED IN MIZUSHIMA CONTINUOUS ANNEALING LINE, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (13): : 1472 - 1472
- [33] THE CONSTRUCTION OF THE NEW REHEATING FURNACE FOR PLATE MILL IN CHIBA WORKS, KAWASAKI-STEEL-CORP .1. HIGH-PERFORMANCE CONTINUOUS REHEATING FURNACE IN CHIBA PLATE MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1181 - 1181
- [34] CONSTRUCTION AND OPERATION OF HOT METAL PRETREATMENT AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .1. CONSTRUCTION AND OPERATION OF HOT METAL PRETREATMENT EQUIPMENT [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S213 - S213
- [35] THE RESULTS OF IMPROVEMENT IN THE SLAB CASTERS IN NO-2 STEELMAKING SHOP AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .1. IMPROVEMENT OF OPERATIONAL CONDITIONS AND QUALITY OF PRODUCTS [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S153 - S153
- [39] CONVERSION TO COMBINED BLOWING SYSTEM WITH WIDE-RANGE OF FLOW-RATE .2. CONTROL-SYSTEM FOR COMBINED TOP-BLOWN AND BOTTOM-BLOWN CONVERTER OF NO-1 STEELMAKING PLANT AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S177 - S177
- [40] MODIFICATION OF FINISHING TRAIN AT NO-2 HOT STRIP MILL, CHIBA WORKS, KAWASAKI-STEEL-CORP .2. CONTROL-SYSTEM AND CONTROL EFFECT FOR WORK ROLL SHIFT MILL [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1221 - 1221