AN ASSEMBLY LINE BALANCING PROBLEM AUTOMOTIVE CABLES

被引:1
|
作者
Triki, Hager [1 ]
Hachicha, Wafik [2 ]
Mellouli, Ahmed [3 ]
Masmoudi, Faouzi [4 ]
机构
[1] Univ Sfax, Sfax Engn Sch, ENIS, Sfax, Tunisia
[2] Higher Inst Ind Management Sfax, Sfax, Tunisia
[3] Univ Sousse, Sousse Engn Sch, ENISo, Sousse, Tunisia
[4] Modeling & Prod La2MP Engn Sch Sfax, Lab Res Mech, Sfax, Tunisia
关键词
assembly line balancing problem; genetic algorithm; cycle time; precedence and zoning constrains;
D O I
10.1515/mper-2015-0008
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, an Assembly Line Balancing Problem (ALBP) is presented in a real-world automotive cables manufacturer company. This company found it necessary to balance its line, since it needs to increase the production rate. In this ALBP, the number of stations is known and the objective is to minimize cycle time where both precedence and zoning constrains must be satisfied. This problem is formulated as a binary linear program (BLP). Since this problem is NP-hard, an innovative Genetic Algorithm (GA) is implemented. The full factorial design is used to obtain the better combination GA parameters and a simple convergence experimental study is performed on the stopping criteria to reduce computational time. Comparison of the proposed GA results with CPLEX software shows that, in a reasonable time, the GA generates consistent solutions that are very close to their optimal ones. Therefore, the proposed GA approach is very effective and competitive.
引用
收藏
页码:59 / 66
页数:8
相关论文
共 50 条
  • [41] Simulated Annealing for the Assembly Line Balancing Problem in the Garment Industry
    Mai Huong Dinh
    Viet Dung Nguyen
    Van Long Truong
    Phan Thum Do
    Thanh Thao Phan
    Duc Nghia Nguyen
    SOICT 2019: PROCEEDINGS OF THE TENTH INTERNATIONAL SYMPOSIUM ON INFORMATION AND COMMUNICATION TECHNOLOGY, 2019, : 36 - 42
  • [42] An integrated model for assembly line re-balancing problem
    Belassiria, Imad
    Mazouzi, Mohamed
    ELfezazi, Said
    Cherrafi, Anass
    ELMaskaoui, Zakaria
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (16) : 5324 - 5344
  • [43] A review of two-sided assembly line balancing problem
    Muhammad Razif Abdullah Make
    Mohd Fadzil Faisae Ab. Rashid
    Muhamad Magffierah Razali
    The International Journal of Advanced Manufacturing Technology, 2017, 89 : 1743 - 1763
  • [44] Optimally solving the alternative subgraphs assembly line balancing problem
    Armin Scholl
    Nils Boysen
    Malte Fliedner
    Annals of Operations Research, 2009, 172 : 243 - 258
  • [45] The Assembly Line Balancing Problem with Task Splitting: A Case Study
    Grzechca, W.
    Foulds, L. R.
    IFAC PAPERSONLINE, 2015, 48 (03): : 2002 - 2008
  • [46] A fuzzy assembly line balancing problem with physical workload constraints
    Mutlu, Ozcan
    Ozgormus, Elif
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) : 5281 - 5291
  • [47] An Exact Method for the Assembly Line Re-balancing Problem
    Makssoud, Fatme
    Battaia, Olga
    Dolgui, Alexandre
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: SUSTAINABLE PRODUCTION AND SERVICE SUPPLY CHAINS, PT 1, 2013, 414 : 159 - 166
  • [48] Assembly Line Worker Assignment and Balancing Problem with Positional Constraints
    Yang, Hyungjoon
    Lee, Je-Hun
    Kim, Hyun-Jung
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, PT V, 2021, 634 : 3 - 11
  • [49] Assembly line balancing problem with deterioration tasks and learning effect
    Toksari, M. Duran
    Isleyen, Selcuk K.
    Guner, Ertan
    Baykoc, Omer Faruk
    EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (02) : 1223 - 1228
  • [50] A Goal Programming Approach for Robotic Assembly Line Balancing Problem
    Cil, Zeynel Abidin
    Mete, Suleyman
    Agpak, Kursad
    IFAC PAPERSONLINE, 2016, 49 (12): : 938 - 942