AN ASSEMBLY LINE BALANCING PROBLEM AUTOMOTIVE CABLES

被引:1
|
作者
Triki, Hager [1 ]
Hachicha, Wafik [2 ]
Mellouli, Ahmed [3 ]
Masmoudi, Faouzi [4 ]
机构
[1] Univ Sfax, Sfax Engn Sch, ENIS, Sfax, Tunisia
[2] Higher Inst Ind Management Sfax, Sfax, Tunisia
[3] Univ Sousse, Sousse Engn Sch, ENISo, Sousse, Tunisia
[4] Modeling & Prod La2MP Engn Sch Sfax, Lab Res Mech, Sfax, Tunisia
关键词
assembly line balancing problem; genetic algorithm; cycle time; precedence and zoning constrains;
D O I
10.1515/mper-2015-0008
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, an Assembly Line Balancing Problem (ALBP) is presented in a real-world automotive cables manufacturer company. This company found it necessary to balance its line, since it needs to increase the production rate. In this ALBP, the number of stations is known and the objective is to minimize cycle time where both precedence and zoning constrains must be satisfied. This problem is formulated as a binary linear program (BLP). Since this problem is NP-hard, an innovative Genetic Algorithm (GA) is implemented. The full factorial design is used to obtain the better combination GA parameters and a simple convergence experimental study is performed on the stopping criteria to reduce computational time. Comparison of the proposed GA results with CPLEX software shows that, in a reasonable time, the GA generates consistent solutions that are very close to their optimal ones. Therefore, the proposed GA approach is very effective and competitive.
引用
收藏
页码:59 / 66
页数:8
相关论文
共 50 条
  • [31] Metaheuristic procedures for the lexicographic bottleneck assembly line balancing problem
    Pastor, Rafael
    Garcia-Villoria, Alberto
    Laguna, Manuel
    Marti, Rafael
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2015, 66 (11) : 1815 - 1825
  • [32] Assembly line resource assignment and balancing problem of type 2
    Hager, Triki
    Ahmed, Mellouli
    Faouzi, Masmoudi
    Lecture Notes in Mechanical Engineering, 2013, 1 : 627 - 634
  • [33] Simple heuristics for the assembly line worker assignment and balancing problem
    Mayron César O. Moreira
    Marcus Ritt
    Alysson M. Costa
    Antonio A. Chaves
    Journal of Heuristics, 2012, 18 : 505 - 524
  • [34] IMPROVED NETWORK BASED ALGORITHMS FOR THE ASSEMBLY LINE BALANCING PROBLEM
    EASTON, F
    FAALAND, B
    KLASTORIN, TD
    SCHMITT, T
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (11) : 1901 - 1915
  • [35] A linear physical programming model for assembly line balancing problem
    Akpinar, Muhammet Enes
    JOURNAL OF ENGINEERING RESEARCH, 2022, 10 (1A): : 316 - 329
  • [36] Procedures for the Time and Space constrained Assembly Line Balancing Problem
    Bautista, Joaquin
    Pereira, Jordi
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 212 (03) : 473 - 481
  • [37] The assembly line balancing problem as an N-person game
    Kaluski, J
    INTELLIGENT ASSEMBLY AND DISASSEMBLY (IAD'98), 1998, : 41 - 46
  • [38] A review of two-sided assembly line balancing problem
    Make, Muhammad Razif Abdullah
    Ab Rashid, Mohd Fadzil Faisae
    Razali, Muhamad Magffierah
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2017, 89 (5-8): : 1743 - 1763
  • [39] A survey of the literature on the multiple or parallel assembly line balancing problem
    Lusa, Amaia
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2008, 2 (01) : 50 - 72
  • [40] Simple heuristics for the assembly line worker assignment and balancing problem
    Moreira, Mayron Cesar O.
    Ritt, Marcus
    Costa, Alysson M.
    Chaves, Antonio A.
    JOURNAL OF HEURISTICS, 2012, 18 (03) : 505 - 524