On a make-to-stock production/mountain modeln with hysteretic control

被引:0
|
作者
O. Boxma
A. Löpker
D. Perry
机构
[1] Eindhoven University of Technology,Department of Mathematics and Computer Science
[2] Helmut Schmidt University Hamburg,Department of Economics and Social Sciences
[3] University of Haifa,Department of Statistics
来源
关键词
Hysteretic Control; Busy Period; Demand Rate; Production Inventory Model; Buffer Content;
D O I
暂无
中图分类号
学科分类号
摘要
We consider a make-to-stock production-inventory model with one machine that produces stock in a buffer. The machine is subject to breakdowns. During up periods, the machine fills the buffer at a level-dependent rate α(x)>0\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha (x)>0$$\end{document}. During down periods, the production rate is zero, and the demand rate is either β(x)>0\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta (x)>0$$\end{document} or γ(x)>0\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\gamma (x)>0$$\end{document} when the inventory level is x\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$x$$\end{document}; which of the two demand rates applies depends on a hysteretic control policy. Such a policy is used to avoid undesirable rapid switching. In the context of our paper hysteresis is introduced in the form of bang-bang control. Namely, there are two switchover levels such that when the buffer content reaches the higher level we change the drift downward and when the buffer content reaches the lower level we change the drift upward. We determine the conditions under which the steady-state distribution of the inventory level exists, and we derive that distribution. Other performance measures under consideration are the number of switches from β(·)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta (\cdot )$$\end{document} to γ(·)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\gamma (\cdot )$$\end{document} per busy period, the busy period distribution, and the overshoot above a particular hysteretic level.
引用
收藏
页码:53 / 82
页数:29
相关论文
共 50 条
  • [31] Equilibrium Joining Strategies and Optimal Control of a Make-to-Stock Queue
    Li, Qingying
    Guo, Pengfei
    Li, Chung-Lun
    Song, Jing-Sheng
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2016, 25 (09) : 1513 - 1527
  • [32] Optimal control of a make-to-stock system with adjustable service rate
    Mayorga, Maria E.
    Ahn, Hyun-Soo
    Shanthikumar, J. George
    [J]. PROBABILITY IN THE ENGINEERING AND INFORMATIONAL SCIENCES, 2006, 20 (04) : 609 - 634
  • [33] Production control problem for multi-product multi-resource make-to-stock systems
    Ozkan, Sinem
    Bulut, Onder
    Dincer, Mehmet Cemali
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2024, 15 (02) : 569 - 592
  • [34] Production and Inventory Control for a Make-to-Stock/Calibrate-to-Order System with Dedicated and Shared Resources
    Demirel, Sueleyman
    Duenyas, Izak
    Kapuscinski, Roman
    [J]. OPERATIONS RESEARCH, 2015, 63 (04) : 823 - 839
  • [35] Flexible lot sizing in hybrid make-to-order/make-to-stock production planning
    Beemsterboer, Bart
    Land, Martin
    Teunter, Ruud
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 260 (03) : 1014 - 1023
  • [36] A developed production control and scheduling model in the semiconductor manufacturing systems with hybrid make-to-stock/make-to-order products
    H. Eivazy
    M. Rabbani
    M. Ebadian
    [J]. The International Journal of Advanced Manufacturing Technology, 2009, 45 : 968 - 986
  • [37] Optimal production and pricing policies in a combined make-to-order/make-to-stock system
    Chen, Xu
    Tai, Allen H.
    Yang, Yi
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (23) : 7027 - 7045
  • [38] Optimal Production and Admission Policies in Make-to-Stock/Make-to-Order Manufacturing Systems
    Iravani, Seyed M. R.
    Liu, Tieming
    Simchi-Levi, David
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2012, 21 (02) : 224 - 235
  • [39] A developed production control and scheduling model in the semiconductor manufacturing systems with hybrid make-to-stock/make-to-order products
    Eivazy, H.
    Rabbani, M.
    Ebadian, M.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 45 (9-10): : 968 - 986
  • [40] Inventory Rationing in a Make-to-Stock System with Batch Production and Lost Sales
    Pang, Zhan
    Shen, Houcai
    Cheng, T. C. E.
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2014, 23 (07) : 1243 - 1257