On a make-to-stock production/mountain modeln with hysteretic control

被引:0
|
作者
O. Boxma
A. Löpker
D. Perry
机构
[1] Eindhoven University of Technology,Department of Mathematics and Computer Science
[2] Helmut Schmidt University Hamburg,Department of Economics and Social Sciences
[3] University of Haifa,Department of Statistics
来源
关键词
Hysteretic Control; Busy Period; Demand Rate; Production Inventory Model; Buffer Content;
D O I
暂无
中图分类号
学科分类号
摘要
We consider a make-to-stock production-inventory model with one machine that produces stock in a buffer. The machine is subject to breakdowns. During up periods, the machine fills the buffer at a level-dependent rate α(x)>0\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\alpha (x)>0$$\end{document}. During down periods, the production rate is zero, and the demand rate is either β(x)>0\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta (x)>0$$\end{document} or γ(x)>0\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\gamma (x)>0$$\end{document} when the inventory level is x\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$x$$\end{document}; which of the two demand rates applies depends on a hysteretic control policy. Such a policy is used to avoid undesirable rapid switching. In the context of our paper hysteresis is introduced in the form of bang-bang control. Namely, there are two switchover levels such that when the buffer content reaches the higher level we change the drift downward and when the buffer content reaches the lower level we change the drift upward. We determine the conditions under which the steady-state distribution of the inventory level exists, and we derive that distribution. Other performance measures under consideration are the number of switches from β(·)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\beta (\cdot )$$\end{document} to γ(·)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\gamma (\cdot )$$\end{document} per busy period, the busy period distribution, and the overshoot above a particular hysteretic level.
引用
收藏
页码:53 / 82
页数:29
相关论文
共 50 条
  • [21] Optimal admission policy in make-to-stock/make-to-order production systems
    Ernez Gahbiche, Ibtissem
    Hadj Youssef, Khaled
    Jemai, Zied
    [J]. PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 134 - 143
  • [22] Subcontracting in a make-to-stock production system, IPA gradients for an SFM
    Al-Shihabi, S
    [J]. Proceedings of the 2005 Winter Simulation Conference, Vols 1-4, 2005, : 819 - 824
  • [23] MASTER PRODUCTION SCHEDULING MAKE-TO-STOCK PRODUCTS - A FRAMEWORK FOR ANALYSIS
    SRIDHARAN, V
    BERRY, WL
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (03) : 541 - 558
  • [24] The impact of production time variability on make-to-stock queue performance
    Sanajian, Nima
    Balcioglu, Baris
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 194 (03) : 847 - 855
  • [25] Production planning system for a combination of make-to-stock and make-to-order products
    Tsubone, H
    Ishikawa, Y
    Yamamoto, H
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (18) : 4835 - 4851
  • [26] Inventory rationing, admission control, and production capacity allocation in a make-to-stock/make-to-order manufacturing system
    Kim, Eungab
    [J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2024,
  • [27] Integrating advance order information in make-to-stock production systems
    Karaesmen, F
    Buzacott, JA
    Dallery, Y
    [J]. IIE TRANSACTIONS, 2002, 34 (08) : 649 - 662
  • [28] Optimal dynamic scheduling policy for a make-to-stock production system
    Ha, AY
    [J]. OPERATIONS RESEARCH, 1997, 45 (01) : 42 - 53
  • [29] A fuzzy aggregate production planning model for make-to-stock environments
    Tavakkoli-Moghaddam, R.
    rabbani, M.
    Gharehgozli, A. H.
    Zaerpour, N.
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1609 - 1613
  • [30] Materials Flow Control in Hybrid Make-to-Stock/Make-to-Order Manufacturing
    Rocha, Filipa
    Silva, Emanuel
    Lopes, Angela
    Dias, Luis
    Pereira, Guilherme
    Fernandes, Nuno O.
    Carmo-Silva, S.
    [J]. COMPUTATIONAL LOGISTICS (ICCL 2015), 2015, 9335 : 559 - 568