Comprehensive Evaluation Model of Debris Flow Risk in Hydropower Projects

被引:0
|
作者
Huaizhi Su
Meng Yang
Yeyuan Kang
机构
[1] Hohai University,State Key Laboratory of Hydrology
[2] Hohai University,Water Resources and Hydraulic Engineering
[3] Hohai University,College of Water Conservancy and Hydropower Engineering
来源
关键词
Debris flow; Uncertainty analysis; Risk evaluation; Case-based reasoning model; Fuzzy optimal recognition model;
D O I
暂无
中图分类号
学科分类号
摘要
Debris flow risk in hydropower project is influenced by many factors such as own characteristics of debris flow, the scale and importance of hydropower project. It is a multi-index comprehensive evaluation problem for debris flow risk. According to the features on debris flow risk in hydropower project, the case-based reasoning method and fuzzy optimal recognition method are adopted to build the evaluation model for debris flow risk. Firstly, an evaluation index system of debris flow risk, which can describe the multiple influence factors on debris flow risk in hydropower project, is proposed. Based on the historical debris flow data, a typical debris flow base is established. Secondly, considering the uncertainty of debris flow in hydropower project, two evaluation models of debris flow risk, namely case-based reasoning model and fuzzy optimal recognition model, are established. Lastly, the two models are used to analyze and evaluate the debris flow risk in one actual hydropower project. The capabilities of two models are compared. It is indicated that the proposed models are suitable to be used to implement the comprehensive evaluation of debris flow risk in hydropower projects.
引用
收藏
页码:1151 / 1163
页数:12
相关论文
共 50 条
  • [31] Climate change impacts on financial risk in hydropower projects
    Harrison, GP
    Whittington, HW
    Wallace, AR
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (04) : 1324 - 1330
  • [32] Financiers' perceptions of risk in relation to large hydropower projects
    Braeckman, Judith Plummer
    Markkanen, Sanna
    Seega, Nina
    ENVIRONMENTAL RESEARCH: INFRASTRUCTURE AND SUSTAINABILITY, 2022, 2 (01):
  • [33] Risk management of hydropower projects for sustainable development: a review
    Shaktawat, Anuja
    Vadhera, Shelly
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2021, 23 (01) : 45 - 76
  • [34] Risk management of hydropower projects for sustainable development: a review
    Anuja Shaktawat
    Shelly Vadhera
    Environment, Development and Sustainability, 2021, 23 : 45 - 76
  • [35] Integrated debris flow disaster mitigation - A comprehensive method for debris flow disaster mitigation
    Weinmeister H.W.
    Journal of Mountain Science, 2007, 4 (4) : 293 - 308
  • [36] Integrated debris flow disaster mitigation - A comprehensive method for debris flow disaster mitigation
    Weinmeister, H. Wolfgang
    JOURNAL OF MOUNTAIN SCIENCE, 2007, 4 (04) : 293 - 308
  • [37] Evaluation of the comprehensive progress of projects
    Wu, Chuncheng
    Qi, Hongwei
    Yue, Chaoyuan
    Wang, Ganyi
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2007, 35 (05): : 127 - 129
  • [38] Fuzzy Comprehensive Evaluation on the Projects Risk Based Set Pair Analysis
    Li, Gaoyang
    MECHATRONICS AND INTELLIGENT MATERIALS II, PTS 1-6, 2012, 490-495 : 1221 - 1225
  • [39] Performance evaluation of desilting basins of small hydropower projects
    Singh G.
    Kumar A.
    ISH Journal of Hydraulic Engineering, 2016, 22 (02) : 135 - 141
  • [40] Application of Gray-Fuzzy Comprehensive Evaluation in Duration Risk Forecast of Hydropower Project
    An, Hui
    Tang, Shouyuan
    Wang, Ru
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2434 - +