Comprehensive Evaluation Model of Debris Flow Risk in Hydropower Projects

被引:0
|
作者
Huaizhi Su
Meng Yang
Yeyuan Kang
机构
[1] Hohai University,State Key Laboratory of Hydrology
[2] Hohai University,Water Resources and Hydraulic Engineering
[3] Hohai University,College of Water Conservancy and Hydropower Engineering
来源
关键词
Debris flow; Uncertainty analysis; Risk evaluation; Case-based reasoning model; Fuzzy optimal recognition model;
D O I
暂无
中图分类号
学科分类号
摘要
Debris flow risk in hydropower project is influenced by many factors such as own characteristics of debris flow, the scale and importance of hydropower project. It is a multi-index comprehensive evaluation problem for debris flow risk. According to the features on debris flow risk in hydropower project, the case-based reasoning method and fuzzy optimal recognition method are adopted to build the evaluation model for debris flow risk. Firstly, an evaluation index system of debris flow risk, which can describe the multiple influence factors on debris flow risk in hydropower project, is proposed. Based on the historical debris flow data, a typical debris flow base is established. Secondly, considering the uncertainty of debris flow in hydropower project, two evaluation models of debris flow risk, namely case-based reasoning model and fuzzy optimal recognition model, are established. Lastly, the two models are used to analyze and evaluate the debris flow risk in one actual hydropower project. The capabilities of two models are compared. It is indicated that the proposed models are suitable to be used to implement the comprehensive evaluation of debris flow risk in hydropower projects.
引用
收藏
页码:1151 / 1163
页数:12
相关论文
共 50 条
  • [21] Comprehensive Evaluation Model of Evaluating Scientific Research Projects
    Rao, Congjun
    MECHATRONICS, ROBOTICS AND AUTOMATION, PTS 1-3, 2013, 373-375 : 2228 - 2231
  • [22] Knowledge-based risk management model: application in hydropower station projects
    Cavaco, Ednilson
    Muniz Junior, Jorge
    BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2020, 17 (04):
  • [23] An externality evaluation model for hydropower projects: A case study of the Three Gorges Project
    Zheng, Tengfei
    Qiang, Maoshan
    Chen, Wenchao
    Xia, Bingqing
    Wang, Jianing
    ENERGY, 2016, 108 : 74 - 85
  • [24] Study on the Influences of Jugan Gully Debris Flows on the Hydropower Projects in Bailong River
    Wu, Wei-jiang
    Mu, Peng
    Wei, Wan-hong
    INTERNATIONAL CONFERENCE ON WATER RESOURCE AND ENVIRONMENTAL PROTECTION WREP 2014, 2014, : 254 - 260
  • [25] Evaluation and governance design of risk factor of debris flow on Gunmaling
    Nie, Lei
    Xu, Lina
    Yu, Yanxin
    ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 3151 - +
  • [26] Assessment of environmental flow requirements for hydropower projects in India
    Jain, Sharad K.
    CURRENT SCIENCE, 2015, 108 (10): : 1815 - 1825
  • [27] Information model for slope construction in hydropower projects
    水电工程边坡施工全过程信息模型研究与应用
    1600, Tsinghua University (60): : 566 - 574
  • [28] Research on Model of Comprehensive Fuzzy Assessment of Projects Post Evaluation
    Zhu, Hongzhang
    Hu, Jibo
    ADVANCES IN BUILDING MATERIALS, PTS 1-3, 2011, 261-263 : 566 - 570
  • [29] Screening of debris flow risk factors and risk evaluation based on rank correlation
    Chen, Peng-Yu
    Qiao, Jing-Shun
    Peng, Zu-Wu
    Xie, Kai
    Yu, Hong-Ming
    Yantu Lixue/Rock and Soil Mechanics, 2013, 34 (05): : 1409 - 1415
  • [30] Screening of debris flow risk factors and risk evaluation based on rank correlation
    Chen Peng-yu
    Qiao Jing-shun
    Peng Zu-wu
    Xie Kai
    Yu Hong-ming
    ROCK AND SOIL MECHANICS, 2013, 34 (05) : 1409 - 1415