Comprehensive Evaluation Model of Debris Flow Risk in Hydropower Projects

被引:0
|
作者
Huaizhi Su
Meng Yang
Yeyuan Kang
机构
[1] Hohai University,State Key Laboratory of Hydrology
[2] Hohai University,Water Resources and Hydraulic Engineering
[3] Hohai University,College of Water Conservancy and Hydropower Engineering
来源
关键词
Debris flow; Uncertainty analysis; Risk evaluation; Case-based reasoning model; Fuzzy optimal recognition model;
D O I
暂无
中图分类号
学科分类号
摘要
Debris flow risk in hydropower project is influenced by many factors such as own characteristics of debris flow, the scale and importance of hydropower project. It is a multi-index comprehensive evaluation problem for debris flow risk. According to the features on debris flow risk in hydropower project, the case-based reasoning method and fuzzy optimal recognition method are adopted to build the evaluation model for debris flow risk. Firstly, an evaluation index system of debris flow risk, which can describe the multiple influence factors on debris flow risk in hydropower project, is proposed. Based on the historical debris flow data, a typical debris flow base is established. Secondly, considering the uncertainty of debris flow in hydropower project, two evaluation models of debris flow risk, namely case-based reasoning model and fuzzy optimal recognition model, are established. Lastly, the two models are used to analyze and evaluate the debris flow risk in one actual hydropower project. The capabilities of two models are compared. It is indicated that the proposed models are suitable to be used to implement the comprehensive evaluation of debris flow risk in hydropower projects.
引用
收藏
页码:1151 / 1163
页数:12
相关论文
共 50 条
  • [1] Comprehensive Evaluation Model of Debris Flow Risk in Hydropower Projects
    Su, Huaizhi
    Yang, Meng
    Kang, Yeyuan
    WATER RESOURCES MANAGEMENT, 2016, 30 (03) : 1151 - 1163
  • [2] Comprehensive Mathematical Evaluation on Risk of Debris Flow
    Liao, Fangwei
    Liu, Xiao
    Liu, Ping
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 829 - +
  • [3] A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects
    Bai, Libiao
    Li, Yi
    Du, Qiang
    Xu, Yadan
    SUSTAINABILITY, 2017, 9 (10)
  • [4] FUZZY COMPREHENSIVE EVALUATION OF DEBRIS FLOW RISK BASED ON PROBABILITY COMBINED WEIGHT
    Li, Li
    Zhang, Shixin
    Qiang, Yue
    Zhao, Dongsheng
    Liu, Chaoqiong
    Zheng, Zhou
    Xia, Changsi
    FRESENIUS ENVIRONMENTAL BULLETIN, 2021, 30 (09): : 10610 - 10624
  • [5] Risk evaluation of debris flow using a digital terrain model
    Nunokawa, Osamu, 1600, Ken-yusha Inc. (55):
  • [6] Evaluation Method of Synergy Degree for Comprehensive Benefits System of Hydropower Projects
    Zhou, Xuan
    Chen, Chen
    Chen, Jiankang
    Li, Yanling
    Lu, Xiang
    Li, Junru
    Wang, Yongfei
    SUSTAINABILITY, 2021, 13 (19)
  • [7] Analysis for Debris Flow Disaster Insurance Risk in Sichuan Province Based on Fuzzy Comprehensive Evaluation
    Liu, Li
    Sun, Xipeng
    Wang, Shige
    Ye, Fan
    THEORY AND PRACTICE OF RISK ANALYSIS AND CRISIS RESPONSE, PROCEEDINGS, 2008, : 320 - +
  • [8] Risk Evaluation of Debris Flow Hazard Based on Asymmetric Connection Cloud Model
    Xu, Xinyu
    Wang, Mingwu
    Li, Yafeng
    Zhang, Libiao
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2017, 2017
  • [9] Macro-comprehensive evaluation method of high rock slope stability in hydropower projects
    Huaizhi Su
    Jinyou Li
    Jiping Cao
    Zhiping Wen
    Stochastic Environmental Research and Risk Assessment, 2014, 28 : 213 - 224
  • [10] Macro-comprehensive evaluation method of high rock slope stability in hydropower projects
    Su, Huaizhi
    Li, Jinyou
    Cao, Jiping
    Wen, Zhiping
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2014, 28 (02) : 213 - 224