Deterministic and Probabilistic Evaluation of Liquefaction Potential: A Case Study from 2015 Gorkha (Nepal) Earthquake

被引:0
|
作者
Sanjay K. Jha
Bishal Karki
Amrit Bhattarai
机构
[1] Digicon Consult,
[2] Creative Geotechnical Laboratory,undefined
[3] Institute of Engineering,undefined
[4] Pulchowk,undefined
关键词
Liquefaction; Factor of safety; Reliability; Probability of failure; Gorkha earthquake;
D O I
暂无
中图分类号
学科分类号
摘要
During April 25, 2015 Gorkha (Nepal) earthquake (Mw 7.8), soil liquefaction was observed at several locations in Kathmandu valley. In this study, deterministic and probabilistic evaluation of liquefaction potential was performed for a liquefied site in Bungamati, Lalitpur, Nepal. Two boreholes of depth 20 m each were drilled and standard penetration test was conducted in both boreholes. The factor of safety against liquefaction was calculated using deterministic methods. In the probabilistic study, the probability of liquefaction was calculated using first order second moment (FOSM) method. The FOSM method considers uncertainty in input parameters of the model and output is represented in terms of mean value and standard deviation of the safety factor. Reliability index and the probability of failure were calculated and correlation between factor of safety and probability of failure was obtained. Based on anticipated variability in soil and seismic parameters, factor of safety required for specified risk level is presented.
引用
收藏
页码:4369 / 4384
页数:15
相关论文
共 50 条
  • [21] An outbreak of scrub typhus in nepal following the 2015 Gorkha earthquake
    Bastola, A.
    Pant, N.
    INTERNATIONAL JOURNAL OF INFECTIOUS DISEASES, 2016, 53 : 55 - 55
  • [22] Landslide Movement at Lokanthali during the 2015 Earthquake in Gorkha, Nepal
    Tiwari, Binod
    Pradel, Daniel
    Ajmera, Beena
    Yamashiro, Brian
    Khadka, Diwakar
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2018, 144 (03)
  • [23] The Performance of Slender Monuments During the 2015 Gorkha, Nepal, Earthquake
    Mehrotra, Anjali
    DeJong, Matthew
    EARTHQUAKE SPECTRA, 2017, 33 : S321 - S343
  • [24] Speed and quality of recovery after the Gorkha Earthquake 2015 Nepal
    Platt, Stephen
    Gautam, Dipendra
    Rupakhety, Rajesh
    INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2020, 50
  • [25] Damage Assessment of Cultural Heritage Structures after the 2015 Gorkha, Nepal, Earthquake: A Case Study of Jagannath Temple
    Shrestha, Sujan
    Shrestha, Bipin
    Shakya, Manjip
    Maskey, Prem Nath
    EARTHQUAKE SPECTRA, 2017, 33 : S363 - S376
  • [26] Status and Challenges of Reconstruction of Heritage Structures in Nepal After 2015 Gorkha, Nepal Earthquake
    Sharma, Keshab
    Apil, K. C.
    Pokharel, Bigul
    HERITAGE AND SOCIETY, 2022, 15 (01): : 89 - 112
  • [27] Overview of the Large 25 April 2015 Gorkha, Nepal, Earthquake from Accelerometric Perspectives
    Bhattarai, M.
    Adhikari, L. B.
    Gautam, U. P.
    Laurendeau, A.
    Labonne, C.
    Hoste-Colomer, R.
    Sebe, O.
    Hernandez, B.
    SEISMOLOGICAL RESEARCH LETTERS, 2015, 86 (06) : 1540 - 1548
  • [28] Gender Differences in Years of Life Lost resulting from the 2015 Gorkha Earthquake in Nepal
    Tonnelier, M.
    Bhandari, M.
    Delforge, D.
    Moitinho de Almeida, M.
    van Loenhout, J.
    Devleesschauwer, B.
    Haagsma, J.
    Speybroeck, N.
    Charalampous, P.
    EUROPEAN JOURNAL OF PUBLIC HEALTH, 2024, 34
  • [29] Post-earthquake damage assessment of traditional masonry buildings: A case study of Bhaktapur municipality following 2015 Gorkha (Nepal) earthquake
    Shakya, Manjip
    Kawan, Chandra Kiran
    Gaire, Arjun Kumar
    Duwal, Sunil
    ENGINEERING FAILURE ANALYSIS, 2021, 123
  • [30] Fractal Characteristics of the Seismic Swarm Succeeding the 2015 Gorkha Earthquake, Nepal
    Ram Krishna Tiwari
    Harihar Paudyal
    Indian Geotechnical Journal, 2023, 53 : 789 - 804