Status and Challenges of Reconstruction of Heritage Structures in Nepal After 2015 Gorkha, Nepal Earthquake

被引:0
|
作者
Sharma, Keshab [1 ]
Apil, K. C. [2 ]
Pokharel, Bigul [3 ]
机构
[1] BGC Engn Inc, Fredericton, NB E3C 0A9, Canada
[2] Tribhuvan Univ, Inst Engn, Kathmandu, Nepal
[3] Univ British Columbia, Sch Engn, Fac Appl Sci, Okanagan Campus, Kelowna, BC, Canada
来源
HERITAGE AND SOCIETY | 2022年 / 15卷 / 01期
关键词
Gorkha earthquake; heritage structure; Kathmandu valley; reconstruction; tourism; PERFORMANCE;
D O I
10.1080/2159032X.2022.2126229
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
A destructive earthquake of moment magnitude M-w 7.8 struck central Nepal on April 25, 2015, followed by hundreds of aftershocks. A preliminary report of the Department of Archaeology (DOA), Nepal, suggested that as many as 745 monuments in 20 districts were affected. The heritage structures are crucial sectors for development, mainly through tourism and employment generation. However, over three years following the Gorkha Nepal earthquake, many collapsed heritage structures were not reconstructed. This paper explores the progress of heritage reconstruction in Kathmandu Valley along with the reasons behind the slow reconstruction process. Ethnographic fieldwork was carried out in the seven UNESCO listed heritage sites and other heritage areas over six months from November 2019 to April 2020. The research shows that the delay in heritage reconstruction was primarily due to the lack of a well-defined policy for heritage reconstruction; conflict on construction materials to be used for reconstruction; procurement modality for reconstruction; limited governance capacity; lack of workforce for traditional artwork; and the lack of a framework to support community-driven rebuilding initiatives. Some recommendations are made to accelerate the reconstruction of heritage structures in Kathmandu Valley.
引用
收藏
页码:89 / 112
页数:24
相关论文
共 50 条
  • [1] Damage to Cultural Heritage Structures and Buildings Due to the 2015 Nepal Gorkha Earthquake
    Bhagat, Satish
    Buddika, H. A. D. Samith
    Adhikari, Rohit Kumar
    Shrestha, Anuja
    Bajracharya, Sanjeema
    Joshi, Rejina
    Singh, Jenisha
    Maharjan, Rajali
    Wijeyewickrema, Anil C.
    [J]. JOURNAL OF EARTHQUAKE ENGINEERING, 2018, 22 (10) : 1861 - 1880
  • [2] Reviewing the progress of reconstruction five years after the 2015 Gorkha earthquake, Nepal
    Acharya, Prabin
    Sharma, Keshab
    Pokharel, Govind Raj
    Adhikari, Rachana
    [J]. BUILDING RESEARCH AND INFORMATION, 2022, 50 (06): : 595 - 609
  • [3] Reviewing the progress of reconstruction five years after the 2015 Gorkha earthquake, Nepal
    Acharya, Prabin
    Sharma, Keshab
    Pokharel, Govind Raj
    Adhikari, Rachana
    [J]. JOURNAL OF PLANNING LITERATURE, 2022, 37 (03) : 549 - 549
  • [4] Managing Postdisaster Reconstruction after the 2015 Gorkha, Nepal Earthquake and Lessons Learned
    Acharya, Prabin
    Sharma, Keshab
    Pokharel, Govind Raj
    Adhikari, Rachana
    [J]. NATURAL HAZARDS REVIEW, 2022, 23 (04)
  • [5] Damage Assessment of Cultural Heritage Structures after the 2015 Gorkha, Nepal, Earthquake: A Case Study of Jagannath Temple
    Shrestha, Sujan
    Shrestha, Bipin
    Shakya, Manjip
    Maskey, Prem Nath
    [J]. EARTHQUAKE SPECTRA, 2017, 33 : S363 - S376
  • [6] Speed and quality of recovery after the Gorkha Earthquake 2015 Nepal
    Platt, Stephen
    Gautam, Dipendra
    Rupakhety, Rajesh
    [J]. INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2020, 50
  • [7] The road to recovery: Understanding the challenges affecting school reconstruction in rural Nepal following the 2015 Gorkha earthquake
    Westoby, Louise
    Wilkinson, Sean
    Dunn, Sarah
    [J]. INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2021, 56
  • [8] Challenges for reconstruction after Mw7.8 Gorkha earthquake: a study on a devastated area of Nepal
    Sharma, Keshab
    Apil, K. C.
    Subedi, Mandip
    Pokharel, Bigul
    [J]. GEOMATICS NATURAL HAZARDS & RISK, 2018, 9 (01) : 760 - 790
  • [9] Hydropower Infrastructure Performance After the 2015 Gorkha, Nepal, Earthquake Sequence
    Pehlivan, Menzer
    Madugo, Christopher Madden
    Macdonald, Amy
    Rayamajhi, Deepak
    Hashash, Youssef M. A.
    Tiwari, Binod
    [J]. EARTHQUAKE SPECTRA, 2017, 33 : S115 - S132
  • [10] Assessment of Infrastructure Resilience in the 2015 Gorkha, Nepal, Earthquake
    Zhu, Jin
    Manandhar, Barsha
    Truong, Jenny
    Ganapati, N. Emel
    Pradhananga, Nipesh
    Davidson, Rachel A.
    Mostafavi, Ali
    [J]. EARTHQUAKE SPECTRA, 2017, 33 : S147 - S165