Challenges for reconstruction after Mw7.8 Gorkha earthquake: a study on a devastated area of Nepal

被引:33
|
作者
Sharma, Keshab [1 ]
Apil, K. C. [2 ]
Subedi, Mandip [3 ]
Pokharel, Bigul [4 ]
机构
[1] Team Nepal Engn Consultancy & Res Ctr, Lalitpur, Nepal
[2] IOE, Dept Architecture & Urban Planning, Pulchowk Campus, Lalitpur, Nepal
[3] IOE, Dept Civil Engn, Pulchowk Campus, Lalitpur, Nepal
[4] Univ British Columbia, Okanagan Campus, Vancouver, BC, Canada
关键词
Gorkha Nepal Earthquake; damage assessment; challenges; reconstruction; rehabilitation; policy; RECONNAISSANCE REPORT; APRIL; 25; PERFORMANCE; LESSONS;
D O I
10.1080/19475705.2018.1480535
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
The Gorkha earthquake on April 25, 2015 had significantly affected the livelihood of people and the overall economy in Nepal. The earthquake had caused damage to about half a million private and public buildings, apart from damage to other infrastructures including schools, hospitals, roads, hydropower, irrigation canals, etc. The earthquake had affected the lives of 8 million people. With significant numbers of actors and stakeholders involved in the reconstruction process, no significant relief has reached the ground or is observable even after 3years of the disaster. The government has formed National Reconstruction Authority (NRA) as the focal authority for the reconstruction process which is leading the reconstruction process with line agencies and other stakeholders. The longitudinal study was carried out through semi-structured interviews with the engineers working under NRA, local people and social mobilizer, group discussions, and field observation from June 2015 to August 2016 focusing on challenges for timely and quality reconstruction. The research also reviews the experiences from past events in similar social and political condition. This study concludes that the situation was the result of larger institutional gaps as the absence of local government, lack of coordination, bureaucratic hurdles and political transition, weak governance and cross-cutting issues as accessibility, manpower shortage, knowledge gap and other socio-cultural aspects. Authors supplement that the good governance and strategic incorporation of social and cultural aspects of reconstructions along with the technical cross-cutting issues like skilled labour, resources availability and construction knowledge could help to expedite the reconstruction process.
引用
收藏
页码:760 / 790
页数:31
相关论文
共 50 条
  • [1] Statistical monitoring of aftershock sequences: a case study of the 2015 Mw7.8 Gorkha, Nepal, earthquake
    Ogata, Yosihiko
    Tsuruoka, Hiroshi
    [J]. EARTH PLANETS AND SPACE, 2016, 68
  • [2] Statistical monitoring of aftershock sequences: a case study of the 2015 Mw7.8 Gorkha, Nepal, earthquake
    Yosihiko Ogata
    Hiroshi Tsuruoka
    [J]. Earth, Planets and Space, 68
  • [3] The size, distribution, and mobility of landslides caused by the 2015 Mw7.8 Gorkha earthquake, Nepal
    Roback, Kevin
    Clark, Marin K.
    West, A. Joshua
    Zekkos, Dimitrios
    Li, Gen
    Gallen, Sean F.
    Chamlagain, Deepak
    Godt, Jonathan W.
    [J]. GEOMORPHOLOGY, 2018, 301 : 121 - 138
  • [4] A comparison of observed and predicted ground motions from the 2015 MW7.8 Gorkha, Nepal, earthquake
    Susan E. Hough
    Stacey S. Martin
    Vineet Gahalaut
    Anand Joshi
    M. Landes
    R. Bossu
    [J]. Natural Hazards, 2016, 84 : 1661 - 1684
  • [5] A comparison of observed and predicted ground motions from the 2015 MW7.8 Gorkha, Nepal, earthquake
    Hough, Susan E.
    Martin, Stacey S.
    Gahalaut, Vineet
    Joshi, Anand
    Landes, M.
    Bossu, R.
    [J]. NATURAL HAZARDS, 2016, 84 (03) : 1661 - 1684
  • [6] Gorkha earthquake (MW7.8) and aftershock sequence: A fractal approach
    Tiwari, Ram Krishna
    Paudyal, Harihar
    [J]. EARTHQUAKE SCIENCE, 2022, 35 (03) : 193 - 204
  • [7] Seismotectonics and seismogenesis of Mw7.8 Gorkha earthquake and its aftershocks
    Arora, B. R.
    Bansal, B. K.
    Prajapati, Sanjay K.
    Sutar, Anup K.
    Nayak, Shailesh
    [J]. JOURNAL OF ASIAN EARTH SCIENCES, 2017, 133 : 2 - 11
  • [8] Gorkha earthquake(MW7.8) and aftershock sequence:A fractal approach
    Ram Krishna Tiwari
    Harihar Paudyal
    [J]. Earthquake Science, 2022, 35 (03) : 193 - 204
  • [9] Pre- and post-seismic deformation related to the 2015, Mw7.8 Gorkha earthquake, Nepal
    Gualandi, Adriano
    Avouac, Jean-Philippe
    Galetzka, John
    Genrich, Joachim F.
    Blewitt, Geoffrey
    Adhikari, Lok Bijaya
    Koirala, Bharat Prasad
    Gupta, Ratnamani
    Upreti, Bishal Nath
    Pratt-Sitaula, Beth
    Liu-Zeng, Jing
    [J]. TECTONOPHYSICS, 2017, 714 : 90 - 106
  • [10] Options for developing modernized geodetic datum for Nepal following the April 25, 2015 Mw7.8 Gorkha earthquake
    Pearson, Chris
    Manandhar, Niraj
    Denys, Paul
    [J]. Journal of Applied Geodesy, 2017, 11 (03) : 179 - 184