Minimizing maximum absolute lateness and range of lateness under generalizeddue dates on a single machine

被引:0
|
作者
K. Tanaka
M. Vlach
机构
来源
关键词
Single Machine; Small Integer; Absolute Lateness;
D O I
暂无
中图分类号
学科分类号
摘要
We investigate the problems of minimizing the maximum absolute lateness and range oflateness under generalized due dates on a single machine. In contrast to the traditional duedate cases, we show that these problems are unary NP‐hard. Furthermore, we present simpleapproximation algorithms for these problems, and show that they achieve the performanceratios of n for the problem of minimizing the maximum absolute lateness and of [ n/2 ] forthe problem of minimizing the range of lateness, where [ x ] is the smallest integer no lessthan x.
引用
收藏
页码:507 / 526
页数:19
相关论文
共 50 条
  • [41] A note on minimizing maximum lateness in a two-machine no-wait flowshop
    Dileepan, P
    COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (12) : 2111 - 2115
  • [42] HEURISTIC PROCEDURES FOR SINGLE MACHINE PROBLEM TO MINIMIZE MAXIMUM LATENESS
    LARSON, RE
    DESSOUKY, MI
    AIIE TRANSACTIONS, 1978, 10 (02): : 176 - 183
  • [43] Minimization of maximum lateness with equal processing times for single machine
    Lazarev, Alexander A.
    Arkhipov, Dmitry I.
    IFAC PAPERSONLINE, 2015, 48 (03): : 806 - 809
  • [44] Two-agent single-machine scheduling with release dates and preemption to minimize the maximum lateness
    J. J. Yuan
    C. T. Ng
    T. C. E. Cheng
    Journal of Scheduling, 2015, 18 : 147 - 153
  • [45] Minimization of maximum lateness on parallel machines with a single server and job release dates
    Elidrissi, Abdelhak
    Benmansour, Rachid
    Zufferey, Nicolas
    Benbrahim, Mohammed
    Duvivier, David
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2024, 22 (03): : 351 - 385
  • [46] Heuristics for minimizing maximum lateness on a single machine with family-dependent set-up times
    Uzsoy, Reha
    Velasquez, Juan Diego
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (06) : 2018 - 2033
  • [47] SCHEDULING SEMICONDUCTOR TEST OPERATIONS - MINIMIZING MAXIMUM LATENESS AND NUMBER OF TARDY JOBS ON A SINGLE-MACHINE
    UZSOY, R
    LEE, CY
    MARTINVEGA, LA
    NAVAL RESEARCH LOGISTICS, 1992, 39 (03) : 369 - 388
  • [48] Minimizing maximum lateness of jobs in inventory constrained scheduling
    Briskorn, D.
    Leung, J. Y-T
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (12) : 1851 - 1864
  • [49] Single-machine scheduling to stochastically minimize maximum lateness
    Cai, Xiaoqiang
    Wang, Liming
    Zhou, Xian
    JOURNAL OF SCHEDULING, 2007, 10 (4-5) : 293 - 301
  • [50] Minimizing a weighted quadratic function of job lateness in the single machine system
    Sen, T
    Dileepan, P
    Lind, MR
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 42 (03) : 237 - 243