Minimization of maximum lateness on parallel machines with a single server and job release dates

被引:3
|
作者
Elidrissi, Abdelhak [1 ]
Benmansour, Rachid [2 ]
Zufferey, Nicolas [3 ,4 ]
Benbrahim, Mohammed [5 ]
Duvivier, David [6 ]
机构
[1] Int Univ Rabat, Rabat Business Sch, Parc Technopolis, Rabat, Morocco
[2] Natl Inst Stat & Appl Econ INSEA, Rabat, Morocco
[3] GSEM Univ Geneva, Geneva Sch Econ & Management, Uni Mail, CH-1211 Geneva 4, Switzerland
[4] Interuniv Res Ctr Enterprise Networks Logist & Tra, Montreal, PQ, Canada
[5] Mohammed V Univ, Mohammadia Sch Engineers, MASI Lab, MOAD6 Team, Rabat, Morocco
[6] Univ Polytech Hauts De France, LAMIH, UMR 8201, CNRS, F-59313 Valenciennes, France
来源
关键词
Heuristics; Metaheuristics; Production; Scheduling with a single server; VARIABLE NEIGHBORHOOD SEARCH; 2-MACHINE SCHEDULING PROBLEM; DEPENDENT SETUP TIMES; DEDICATED MACHINES; ALGORITHMS; HEURISTICS; MAKESPAN; MODELS;
D O I
10.1007/s10288-023-00547-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses the problem of scheduling independent jobs with release dates on identical parallel machines with a single server. The goal consists in minimizing the maximum lateness. This is a realistic extension of the traditional parallel machine scheduling problem with a single server, in which all jobs are assumed to be available at the beginning of the schedule. This problem, referred to as P, S1|r(j) |L-max, has various applications in practice. To date, research on it has focused on complexity analysis. To solve small-sized instances of the problem, we present two mixed-integer programming formulations, along with a valid inequality. Due to the NP-hard nature of the problem, we propose a constructive heuristic and two metaheuristics, namely a General Variable Neighborhood Search (GVNS) and a Greedy Randomized Adaptive Search Procedures, both using a Variable Neighborhood Descent as an intensification operator. In the experiments, the proposed algorithms are compared using a set of new instances generated randomly with up to 500 jobs, in line with the related literature. It turns out that GVNS outperforms by far the other approaches.
引用
收藏
页码:351 / 385
页数:35
相关论文
共 50 条
  • [1] Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates
    Lin, Shih-Wei
    Lee, Zne-Jung
    Ying, Kuo-Ching
    Lu, Chung-Cheng
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (05) : 809 - 815
  • [2] Minimization of maximum lateness in a flowshop learning effect scheduling with release dates
    Bai, Danyu
    Bai, Xiaoyuan
    Yang, Jie
    Zhang, Xingong
    Ren, Tao
    Xie, Chenxi
    Liu, Bingqian
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 158 (158)
  • [3] Makespan Minimization On Two Parallel Machines With Release Dates
    Hifi, Mhand
    Kacem, Imed
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 296 - +
  • [4] Single machine scheduling to minimize maximum lateness subject to release dates and precedence constraints
    Liu, Zhixin
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (09) : 1537 - 1543
  • [5] Minimizing maximum lateness in a flow shop subject to release dates
    Haouari, M.
    Ladhari, T.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (01) : 62 - 72
  • [6] Scheduling on uniform parallel machines to minimize maximum lateness
    Koulamas, C
    Kyparisis, GJ
    OPERATIONS RESEARCH LETTERS, 2000, 26 (04) : 175 - 179
  • [7] Scheduling of deteriorating jobs with release dates to minimize the maximum lateness
    Miao, Cuixia
    Zhang, Yuzhong
    Wu, Cuilian
    THEORETICAL COMPUTER SCIENCE, 2012, 462 : 80 - 87
  • [8] ON FLOWSHOP SCHEDULING WITH RELEASE AND DUE DATES TO MINIMIZE MAXIMUM LATENESS
    GRABOWSKI, J
    SKUBALSKA, E
    SMUTNICKI, C
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1983, 34 (07) : 615 - 620
  • [9] Minimizing maximum absolute lateness and range of lateness under generalizeddue dates on a single machine
    K. Tanaka
    M. Vlach
    Annals of Operations Research, 1999, 86 : 507 - 526
  • [10] OPEN-SHOP SCHEDULING WITH RELEASE DATES TO MINIMIZE MAXIMUM LATENESS
    KELLERER, H
    TAUTENHAHN, T
    WOEGINGER, G
    NAVAL RESEARCH LOGISTICS, 1995, 42 (01) : 141 - 145