共 50 条
- [42] Efficient Approaches to Scheduling for Unrelated Parallel Machines with Release Dates IFAC PAPERSONLINE, 2016, 49 (12): : 1743 - 1748
- [43] A branch and bound algorithm to minimize total weighted completion time on identical parallel machines with job release dates 2006 INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2006, : 1192 - 1198
- [45] Hierarchical optimization with double due dates on an unbounded parallel-batching machine to minimize maximum lateness 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2016, 14 (02): : 153 - 164
- [46] Hierarchical optimization with double due dates on an unbounded parallel-batching machine to minimize maximum lateness 4OR, 2016, 14 : 153 - 164
- [47] Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness Computers and Industrial Engineering, 1998, 34 (04): : 793 - 806
- [49] Heuristics for minimizing total completion time and maximum lateness on identical parallel machines with setup times Journal of Intelligent Manufacturing, 2010, 21 : 439 - 449