A multi-objective reliability-redundancy allocation problem with active redundancy and interval type-2 fuzzy parameters

被引:0
|
作者
Pradip Kundu
机构
[1] Birla Global University,Decision Science and Operations Management, School of Management
来源
Operational Research | 2021年 / 21卷
关键词
Multi-objective optimization; Reliability; Redundancy allocation; Interval type-2 fuzzy set;
D O I
暂无
中图分类号
学科分类号
摘要
This paper considers a multi-objective reliability-redundancy allocation problem (MORRAP) of a series-parallel system, where system reliability and system cost are to be optimized simultaneously subject to limits on weight, volume, and redundancy level. Precise computation of component reliability is very difficult as the estimation of a single number for the probabilities and performance levels are not always possible, because it is affected by many factors such as inaccuracy and insufficiency of data, manufacturing process, environment in which the system is running, evaluation done by multiple experts, etc. To cope with impreciseness, we model component reliabilities as interval type-2 fuzzy numbers (IT2 FNs), which is more suitable to represent uncertainties than usual or type-1 fuzzy numbers. To solve the problem with interval type-2 fuzzy parameters, we first apply various type-reduction and defuzzification techniques, and obtain corresponding defuzzified values. As maximization of system reliability and minimization of system cost are conflicting to each other, so to obtain compromise solution of the MORRAP with defuzzified parameters, we apply five different multi-objective optimization methods, and then corresponding solutions are analyzed. The problem is illustrated numerically for a real-world MORRAP on pharmaceutical plant, and solutions are obtained by standard optimization solver LINGO, which is based on gradient-based optimization—Generalized Reduced Gradient technique.
引用
收藏
页码:2433 / 2458
页数:25
相关论文
共 50 条
  • [1] A multi-objective reliability-redundancy allocation problem with active redundancy and interval type-2 fuzzy parameters
    Kundu, Pradip
    [J]. OPERATIONAL RESEARCH, 2021, 21 (04) : 2433 - 2458
  • [2] FUZZY MULTI-OBJECTIVE RELIABILITY-REDUNDANCY ALLOCATION PROBLEM
    Ashraf, Zubair
    Muhuri, Pranab K.
    Lohani, Q. M. Danish
    Nath, Rahul
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS (FUZZ-IEEE), 2014, : 2580 - 2587
  • [3] Multi-objective optimization of reliability-redundancy allocation problem for multi-type production systems considering redundancy strategies
    Wang, Wei
    Lin, Mingqiang
    Fu, Yongnian
    Luo, Xiaoping
    Chen, Hanghang
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2020, 193
  • [4] Multi-objective reliability-redundancy allocation problem using particle swarm optimization
    Garg, Harish
    Sharma, S. P.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (01) : 247 - 255
  • [5] Multiobjective Reliability Redundancy Allocation Problem With Interval Type-2 Fuzzy Uncertainty
    Muhuri, Pranab K.
    Ashraf, Zubair
    Lohani, Q. M. Danish
    [J]. IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2018, 26 (03) : 1339 - 1355
  • [6] Particle Swam Optimization Based Reliability-Redundancy Allocation in a Type-2 Fuzzy Environment
    Ashraf, Zubair
    Muhuri, Pranab K.
    Lohani, Q. M. Danish
    [J]. 2015 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2015, : 1212 - 1219
  • [7] Multi-objective evolutionary algorithm on reliability redundancy allocation with interval alternatives for system parameters
    Maneckshaw, B.
    Mahapatra, G. S.
    [J]. NEURAL COMPUTING & APPLICATIONS, 2022, 34 (21): : 18595 - 18609
  • [8] Multi-objective evolutionary algorithm on reliability redundancy allocation with interval alternatives for system parameters
    B. Maneckshaw
    G. S. Mahapatra
    [J]. Neural Computing and Applications, 2022, 34 : 18595 - 18609
  • [9] Fuzzy reliability-redundancy allocation problem of the overspeed protection system
    Taghiyeh, Sajjad
    Mahmoudi, Morteza
    Fadaie, Saber
    Tohidi, Hossein
    [J]. ENGINEERING REPORTS, 2020, 2 (08)
  • [10] Application of multi-objective particle swarm optimization to solve a fuzzy multi-objective reliability redundancy allocation problem
    Ebrahimipour, V.
    Sheikhalishahi, M.
    [J]. 2011 IEEE INTERNATIONAL SYSTEMS CONFERENCE (SYSCON 2011), 2011, : 326 - 333