Particle Swam Optimization Based Reliability-Redundancy Allocation in a Type-2 Fuzzy Environment

被引:0
|
作者
Ashraf, Zubair [1 ]
Muhuri, Pranab K. [1 ]
Lohani, Q. M. Danish [2 ]
机构
[1] South Asian Univ, Dept Comp Sci, New Delhi 110021, India
[2] South Asian Univ, Dept Math, New Delhi 110021, India
关键词
Reliability Redundancy Allocation Problem; Fuzzy Reliability; Fuzzy Cost; Particle Swarm Optimization; SERIES-PARALLEL SYSTEMS; WEIGHTED-SUM METHOD; MULTIOBJECTIVE OPTIMIZATION;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper, we have addressed the reliability-redundancy allocation problem with a particle swam optimization based technique. The parameters of the system components are actually imprecise or uncertain quantity since those are generally guessed by the designers during the designtime. Thus, important features of the designed system, viz. reliability, costs, weight etc very suitably qualifies to be considered as fuzzy quantity. Our problem formulation considers these parameters as type-2 fuzzy quantity. There are few reports where the problem has been studied under type-1 fuzzy uncertainty. As far as we know, no research has been reported where the problem has been addressed with a particle swam optimization based approach in a type-2 fuzzy environment. Suitable examples are included to demonstrate our approach. Results are compared showing that the type-2 fuzzy uncertainty based approach outperforms other recently reported results.
引用
收藏
页码:1212 / 1219
页数:8
相关论文
共 50 条
  • [1] Type-2 fuzzy reliability-redundancy allocation problem and its solution using particle-swarm optimization algorithm
    Ashraf, Zubair
    Muhuri, Pranab K.
    Lohani, Q. M. Danish
    Roy, Mukul Lata
    [J]. GRANULAR COMPUTING, 2019, 4 (02) : 145 - 166
  • [2] A multi-objective reliability-redundancy allocation problem with active redundancy and interval type-2 fuzzy parameters
    Pradip Kundu
    [J]. Operational Research, 2021, 21 : 2433 - 2458
  • [3] A multi-objective reliability-redundancy allocation problem with active redundancy and interval type-2 fuzzy parameters
    Kundu, Pradip
    [J]. OPERATIONAL RESEARCH, 2021, 21 (04) : 2433 - 2458
  • [4] An improved particle swarm optimization algorithm for the reliability-redundancy allocation problem with global reliability
    Li, Shuai
    Chi, Xuefen
    Yu, Baozhu
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2022, 225
  • [5] Type-2 fuzzy reliability–redundancy allocation problem and its solution using particle-swarm optimization algorithm
    Zubair Ashraf
    Pranab K. Muhuri
    Q. M. Danish Lohani
    Mukul Lata Roy
    [J]. Granular Computing, 2019, 4 : 145 - 166
  • [6] FUZZY MULTI-OBJECTIVE RELIABILITY-REDUNDANCY ALLOCATION PROBLEM
    Ashraf, Zubair
    Muhuri, Pranab K.
    Lohani, Q. M. Danish
    Nath, Rahul
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS (FUZZ-IEEE), 2014, : 2580 - 2587
  • [7] Fuzzy reliability-redundancy allocation problem of the overspeed protection system
    Taghiyeh, Sajjad
    Mahmoudi, Morteza
    Fadaie, Saber
    Tohidi, Hossein
    [J]. ENGINEERING REPORTS, 2020, 2 (08)
  • [8] Multi-objective reliability-redundancy allocation problem using particle swarm optimization
    Garg, Harish
    Sharma, S. P.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (01) : 247 - 255
  • [9] Multiobjective Reliability Redundancy Allocation Problem With Interval Type-2 Fuzzy Uncertainty
    Muhuri, Pranab K.
    Ashraf, Zubair
    Lohani, Q. M. Danish
    [J]. IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2018, 26 (03) : 1339 - 1355
  • [10] Optimization of Reliability-Redundancy Allocation Problems: A Review of the Evolutionary Algorithms
    Marouani, Haykel
    Al-mutiri, Omar
    [J]. CMC-COMPUTERS MATERIALS & CONTINUA, 2022, 71 (01): : 537 - 571