Dynamic job-shop scheduling with sequence-dependent setup times: simulation modeling and analysis

被引:0
|
作者
V. Vinod
R. Sridharan
机构
[1] N.S.S. Engineering College,Department of Mechanical Engineering
[2] National Institute of Technology Calicut,Department of Mechanical Engineering
关键词
Dynamic job-shop scheduling; Sequence-dependent setup; Simulation; Scheduling rules;
D O I
暂无
中图分类号
学科分类号
摘要
This paper presents the salient aspects of a simulation-based experimental study of scheduling rules for scheduling a dynamic job shop in which the setup times are sequence-dependent. A discrete event simulation model of the job shop system is developed for the purpose of experimentation. Seven scheduling rules from the literature are incorporated in the simulation model. Five new setup-oriented scheduling rules are proposed and implemented. Simulation experiments were conducted under various experimental conditions characterized by factors such as shop load, setup time ratios, and due date tightness. The results indicate that setup-oriented rules provide better performance than ordinary rules. The difference in performance between these two groups of rules increases with the increase in shop load and setup time ratio. One of the proposed rules performs better for mean flow time and mean tardiness measures.
引用
下载
收藏
页码:355 / 372
页数:17
相关论文
共 50 条
  • [31] Study on job shop scheduling with sequence-dependent setup times using biological immune algorithm
    Zhou, Yaqin
    Li, Beizhi
    Yang, Jianguo
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 30 (1-2): : 105 - 111
  • [32] A Hybrid Genetic Algorithm for Flexible Job Shop Scheduling Problem With Sequence-Dependent Setup Times and Job Lag Times
    Wang, Yilun
    Zhu, Qianwen
    IEEE ACCESS, 2021, 9 : 104864 - 104873
  • [33] A neighborhood search function for flexible job shop scheduling with separable sequence-dependent setup times
    Abdelmaguid, Tamer F.
    APPLIED MATHEMATICS AND COMPUTATION, 2015, 260 : 188 - 203
  • [34] Study on job shop scheduling with sequence-dependent setup times using biological immune algorithm
    Yaqin Zhou
    Beizhi Li
    Jianguo Yang
    The International Journal of Advanced Manufacturing Technology, 2006, 30 : 105 - 111
  • [35] Bi-criteria flexible job-shop scheduling with sequence-dependent setup times-Variable neighborhood search approach
    Bagheri, A.
    Zandieh, M.
    JOURNAL OF MANUFACTURING SYSTEMS, 2011, 30 (01) : 8 - 15
  • [36] Analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times
    Sharma P.
    Jain A.
    Frontiers of Mechanical Engineering, 2014, 9 (4) : 380 - 389
  • [37] Performance analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times: Simulation approach
    Sharma, Pankaj
    Jain, Ajai
    CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2015, 10 : 110 - 119
  • [38] An efficient algorithm for operation insertion in a multi-resource job-shop schedule with sequence-dependent setup times
    Artigues, C
    Roubellat, F
    PRODUCTION PLANNING & CONTROL, 2002, 13 (02) : 175 - 186
  • [39] Job shop scheduling with sequence dependent setup times to minimize makespan
    Sun, JU
    Yee, SR
    Hwang, H
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2003, 10 (04): : 455 - 461
  • [40] RESCHEDULING OF FLEXIBLE FLOW SHOP WITH SEQUENCE-DEPENDENT SETUP TIMES AND JOB SPLITTING
    Kim, Jun
    Lee, Je-Hun
    Choi, Seong-Lak
    Jung, Hyun-Jin
    Kim, Yun-Bac
    Kim, Hyun-Jung
    Kim, Byung-Hee
    Chung, Gu-Hwan
    2017 WINTER SIMULATION CONFERENCE (WSC), 2017, : 3745 - 3755