Dynamic job-shop scheduling with sequence-dependent setup times: simulation modeling and analysis

被引:0
|
作者
V. Vinod
R. Sridharan
机构
[1] N.S.S. Engineering College,Department of Mechanical Engineering
[2] National Institute of Technology Calicut,Department of Mechanical Engineering
关键词
Dynamic job-shop scheduling; Sequence-dependent setup; Simulation; Scheduling rules;
D O I
暂无
中图分类号
学科分类号
摘要
This paper presents the salient aspects of a simulation-based experimental study of scheduling rules for scheduling a dynamic job shop in which the setup times are sequence-dependent. A discrete event simulation model of the job shop system is developed for the purpose of experimentation. Seven scheduling rules from the literature are incorporated in the simulation model. Five new setup-oriented scheduling rules are proposed and implemented. Simulation experiments were conducted under various experimental conditions characterized by factors such as shop load, setup time ratios, and due date tightness. The results indicate that setup-oriented rules provide better performance than ordinary rules. The difference in performance between these two groups of rules increases with the increase in shop load and setup time ratio. One of the proposed rules performs better for mean flow time and mean tardiness measures.
引用
下载
收藏
页码:355 / 372
页数:17
相关论文
共 50 条
  • [21] A worker constrained flexible job shop scheduling problem with sequence-dependent setup times
    Kress, Dominik
    Mueller, David
    Nossack, Jenny
    OR SPECTRUM, 2019, 41 (01) : 179 - 217
  • [22] Using Genetic Algorithms and Heuristics for Job Shop Scheduling with Sequence-Dependent Setup Times
    Waiman Cheung
    Hong Zhou
    Annals of Operations Research, 2001, 107 : 65 - 81
  • [23] Flow shop batching and scheduling with sequence-dependent setup times
    Liji Shen
    Jatinder N. D. Gupta
    Udo Buscher
    Journal of Scheduling, 2014, 17 : 353 - 370
  • [24] Flow shop batching and scheduling with sequence-dependent setup times
    Shen, Liji
    Gupta, Jatinder N. D.
    Buscher, Udo
    JOURNAL OF SCHEDULING, 2014, 17 (04) : 353 - 370
  • [25] APPLYING A HYBRID MODEL TO SOLVE THE JOB-SHOP SCHEDULING PROBLEM WITH PREVENTIVE MAINTENANCE, SEQUENCE-DEPENDENT SETUP TIMES AND UNKNOWN PROCESSING TIMES
    Ooms, Joep
    Hubl, Alexander
    2022 WINTER SIMULATION CONFERENCE (WSC), 2022, : 1750 - 1761
  • [26] Schedule generation schemes for the job-shop problem with sequence-dependent setup times: Dominance properties and computational analysis
    Artigues, C
    Lopez, P
    Ayache, PD
    ANNALS OF OPERATIONS RESEARCH, 2005, 138 (01) : 21 - 52
  • [27] Schedule Generation Schemes for the Job-Shop Problem with Sequence-Dependent Setup Times: Dominance Properties and Computational Analysis
    Christian Artigues
    Pierre Lopez
    Pierre-Dimitri Ayache
    Annals of Operations Research, 2005, 138 : 21 - 52
  • [28] Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis
    Kia, H. R.
    Davoudpour, H.
    Zandieh, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (14) : 4019 - 4042
  • [29] Modeling and optimization of the hybrid flow shop scheduling problem with sequence-dependent setup times
    Xue, Huiting
    Meng, Leilei
    Duan, Peng
    Zhang, Biao
    Zou, Wenqiang
    Sang, Hongyan
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2024, 15 (02) : 473 - 490
  • [30] Study on job shop scheduling with sequence-dependent setup times using biological immune algorithm
    Zhou, Yaqin
    Li, Beizhi
    Yang, Jianguo
    International Journal of Advanced Manufacturing Technology, 2006, 30 (1-2): : 105 - 111