A model for resource-constrained project scheduling using adaptive PSO

被引:2
|
作者
Neetesh Kumar
Deo Prakash Vidyarthi
机构
[1] Jawaharlal Nehru University,School of Computer and Systems Sciences
来源
Soft Computing | 2016年 / 20卷
关键词
Particle swarm optimization; NP-hard; Heuristics ; Resource-constrained project scheduling problem; Makespan;
D O I
暂无
中图分类号
学科分类号
摘要
Resource-constrained project scheduling problem (RCPSP) is an important, but computationally hard problem. Particle swarm optimization (PSO) is a well-known and highly used meta-heuristics to solve such problems. In this work, a simple, effective and improved version of PSO i.e. adaptive-PSO (A-PSO) is proposed to solve the RCPSP. Conventional canonical PSO is improved at two points; during the particle’s position and velocity updation, due to dependent activities in RCPSP, a high possibility arises for the particle to become invalid. To overcome this, an important operator named valid particle generator (VPG) is proposed and embedded into the PSO which converts an invalid particle into a valid particle effectively with the knowledge of the in-degree and out-degree of the activities depicted by the directed acyclic graph. Second, inertia weight (ω)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$(\omega )$$\end{document} that plays a significant role in the quick convergence of the PSO is adaptively tuned by considering the effects of fitness value, previous value of ω\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\omega $$\end{document} and iteration counter. Performance of the model is evaluated on the standard benchmark data of the RCPSP problem. Results show the effectiveness of the proposed model in comparison to other existing state of the art model that uses heuristics/meta-heuristics. The proposed model has the potential to be applied to other similar problems.
引用
收藏
页码:1565 / 1580
页数:15
相关论文
共 50 条
  • [1] A model for resource-constrained project scheduling using adaptive PSO
    Kumar, Neetesh
    Vidyarthi, Deo Prakash
    [J]. SOFT COMPUTING, 2016, 20 (04) : 1565 - 1580
  • [2] Resource-Constrained Project Scheduling Problem with Modified PSO
    Zhang, Kai
    Jiang, Jing
    Zhao, Guo-rong
    [J]. ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 6: MODELLING & SIMULATION INDUSTRIAL ENGINEERING & MANAGEMENT, 2010, : 308 - 311
  • [3] An improved PSO algorithm for resource-constrained project scheduling problem
    Luo, Xinggang
    Wang, Dingwei
    Tang, Jianfu
    Tu, Yiliu
    [J]. WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 3514 - +
  • [4] Resource-constrained project scheduling and timetabling
    Brucker, P
    Knust, S
    [J]. PRACTICE AND THEORY OF AUTOMATED TIMETABLING III, 2001, 2079 : 277 - 293
  • [5] An adaptive memory programming framework for the resource-constrained project scheduling problem
    Paraskevopoulos, Dimitris C.
    Tarantilis, Christos D.
    Ioannou, George
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (16) : 4938 - 4956
  • [6] AN ITERATIVE SCHEDULING TECHNIQUE FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING
    LI, KY
    WILLIS, RJ
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 56 (03) : 370 - 379
  • [7] Resource-constrained project scheduling - Minimization of project duration
    不详
    [J]. PROJECT SCHEDULING WITH TIME WINDOWS AND SCARCE RESOURCES, 2002, 508 : 21 - 174
  • [8] A linear-discrete scheduling model for the resource-constrained project scheduling problem
    Bonnal, Pierre
    Gourc, Didier
    Hameri, Ari-Pekka
    Lacoste, Germain
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (08) : 797 - 814
  • [9] NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING
    DREXL, A
    GRUENEWALD, J
    [J]. IIE TRANSACTIONS, 1993, 25 (05) : 74 - 81
  • [10] Disruption management for resource-constrained project scheduling
    Zhu, G
    Bard, JF
    Yu, G
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (04) : 365 - 381