A Local Search Algorithm for the Resource-Constrained Project Scheduling Problem

被引:0
|
作者
Goncharov E.N. [1 ,2 ]
机构
[1] Sobolev Institute of Mathematics, Siberian Branch, Russian Academy ofSciences, Novosibirsk
[2] Novosibirsk State University, Novosibirsk
关键词
PSPLIB; renewable resources; resource-constrained project scheduling problem; Tabu search; variable neighborhood search;
D O I
10.1134/S1990478922040081
中图分类号
学科分类号
摘要
Abstract: We consider the resource-constrained project scheduling problem (RCPSP). The problemaccounts for technological constraints of activities precedence together with resource constraints.All resources are renewable. Activities interruptions are not allowed. This problem is NP-hard inthe strong sense. We present a new local search algorithm that uses a Tabu-list and two types ofneighborhoods. The algorithm is evaluated using three data bases of instances of the problem: 480instances of 60 activities, 480 of 90, and 600 of 120 activities, respectively, taken from the PSPLIBlibrary available online. Numerical experiments demonstrate that the proposed algorithm producesbetter results than existing algorithms described in the literature for large-sized instances. Forsome instances from the dataset j120, the best known heuristic solutions were improved. © 2022, Pleiades Publishing, Ltd.
引用
收藏
页码:672 / 683
页数:11
相关论文
共 50 条
  • [41] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    [J]. AUTOMATION IN CONSTRUCTION, 2023, 153
  • [42] Genetic Algorithm Parameters Tuning for Resource-constrained Project Scheduling Problem
    Tian, Xingke
    Yuan, Shengrui
    [J]. ADVANCES IN MATERIALS, MACHINERY, ELECTRONICS II, 2018, 1955
  • [43] Solving Resource-Constrained Project Scheduling Problem Using Metaheuristic Algorithm
    Munlin, Mudarmeen
    [J]. 2018 5TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONIC ENGINEERING (ICEEE), 2018, : 344 - 349
  • [44] A Genetic-Local Search Algorithm Approach for Resource Constrained Project Scheduling Problem
    Kadam, Sachin Uttam
    Mane, Sandip U.
    [J]. 1ST INTERNATIONAL CONFERENCE ON COMPUTING COMMUNICATION CONTROL AND AUTOMATION ICCUBEA 2015, 2015, : 841 - 846
  • [45] Improved differential evolution algorithm for resource-constrained project scheduling problem
    Lianghong Wu1
    2.College of Electrical and Information Engineering
    [J]. Journal of Systems Engineering and Electronics, 2010, 21 (05) : 798 - 805
  • [46] A branch-and-bound algorithm for the resource-constrained project scheduling problem
    U. Dorndorf
    E. Pesch
    T. Phan-Huy
    [J]. Mathematical Methods of Operations Research, 2000, 52 : 413 - 439
  • [47] Improved differential evolution algorithm for resource-constrained project scheduling problem
    Wu, Lianghong
    Wang, Yaonan
    Zhou, Shaowu
    [J]. JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2010, 21 (05) : 798 - 805
  • [48] A branch-and-bound algorithm for the resource-constrained project scheduling problem
    Dorndorf, U
    Pesch, E
    Phan-Huy, T
    [J]. MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2000, 52 (03) : 413 - 439
  • [49] An evolutionary algorithm for resource-constrained project scheduling
    Hindi, KS
    Yang, HB
    Fleszar, K
    [J]. IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (05) : 512 - 518
  • [50] Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm
    Liu, Jia
    Liu, Yisheng
    Shi, Ying
    Li, Jian
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2020, 34 (02)