Project portfolio selection and scheduling under a fuzzy environment

被引:0
|
作者
Xiaoxiong Zhang
Keith W. Hipel
Yuejin Tan
机构
[1] National University of Defense Technology,The Sixty
[2] University of Waterloo,third Research Institute
[3] Centre for International Governance Innovation,Department of Systems Design Engineering
[4] Balsillie School of International Affairs,College of Systems Engineering
[5] National University of Defense Technology,undefined
来源
Memetic Computing | 2019年 / 11卷
关键词
Project portfolio selection and planning; Multi-objective optimization; Fuzzy numbers; Inverse modeling; Gaussian process;
D O I
暂无
中图分类号
学科分类号
摘要
The problem of integrated project portfolio selection and scheduling (PPSS) is among the most important and highly pursed subjects in project management. In this study, a mathematical model and algorithm are designed specifically to assist decision makers decide which projects are to be chosen and when these projects are to be undertaken. More specifically, the PPSS problem is first formulated as a nonlinear multi-objective model with simultaneous consideration of benefit and risk factors. Due to the complexity and uncertainty involved in most real life situations, fuzzy numbers are incorporated into the model, which can provide decision makers with more flexibility. Then, an inverse modeling based multi-objective evolutionary algorithm using a Gaussian Process is presented to obtain the Pareto set. Finally, an illustrative example is used to demonstrate the high efficacy of the foregoing approach, which can provide decision makers with valuable insights into the PPSS process. The proposed algorithm is found to be more effective compared with two other popular algorithms.
引用
收藏
页码:391 / 406
页数:15
相关论文
共 50 条
  • [21] Project portfolio selection and scheduling incorporating dynamic synergy
    Bai, Libiao
    Yang, Mengqin
    Pan, Tong
    Sun, Yichen
    KYBERNETES, 2025, 54 (02) : 996 - 1026
  • [22] Multi-mode project portfolio selection and scheduling in a build-operate-transfer environment
    Ranjbar, Mojtaba
    Nasiri, Mohammad Mahdi
    Torabi, S. Ali
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 189
  • [23] Project Portfolio Selection and Scheduling with Resource Allocation, Synergies, and Project Divisibility
    Arratia-Martinez, Nancy M.
    Hernandez-Gonzalez, Nelly M.
    Lopez-Irarragorri, Fernando
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [24] Applying ELECTRE and Maximizing Deviation Method for Stock Portfolio Selection under Fuzzy Environment
    Chen, Chen-Tung
    Hung, Wei-Zhan
    OPPORTUNITIES AND CHALLENGES FOR NEXT-GENERATION APPLIED INTELLIGENCE, 2009, 214 : 85 - +
  • [25] A zero-one model for project portfolio selection and scheduling
    Ghasemzadeh, F
    Archer, N
    Iyogun, P
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1999, 50 (07) : 745 - 755
  • [26] Simultaneous project portfolio selection and scheduling from contractor perspective
    Tavakolan, Mehdi
    Chokan, Farzad
    Haji, Mostafa Dadashi
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (03) : 298 - 313
  • [27] A Hesitant Fuzzy Set Theory Based Approach for Project Portfolio Selection with Interactions under Uncertainty
    Takami, Maryam Azari
    Sheikh, Reza
    Sana, Shib Sankar
    JOURNAL OF INFORMATION SCIENCE AND ENGINEERING, 2018, 34 (01) : 65 - 79
  • [28] A Novel R&D Project Portfolio Selection Decision Approach Based on Fuzzy Logic and Heuristics Scheduling
    Zhu Danmei
    Zhang Tie
    Wang Xingtong
    Chen Dongling
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 144 - +
  • [29] A fuzzy approach to R&D project portfolio selection
    Carlsson, Christer
    Fullér, Robert
    Heikkilä, Markku
    Majlender, Péter
    International Journal of Approximate Reasoning, 2007, 44 (02): : 93 - 105
  • [30] A comprehensive supply chain management project selection framework under fuzzy environment
    Department of Industrial Engineering and Management, Ching Yun University, Jungli, 320, Taiwan
    不详
    不详
    Int. J. Proj. Manage., 2007, 6 (627-636):