Multi-mode project portfolio selection and scheduling in a build-operate-transfer environment

被引:20
|
作者
Ranjbar, Mojtaba [1 ]
Nasiri, Mohammad Mahdi [1 ]
Torabi, S. Ali [1 ]
机构
[1] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
关键词
Project portfolio selection and scheduling; Fuzzy mathematical programming model; Multi-mode projects; Build-operate-transfer contracts; DECISION-MAKING FRAMEWORK; EPSILON-CONSTRAINT METHOD; FUZZY; OPTIMIZATION; METHODOLOGY; UNCERTAINTY; PRIORITIZATION; COMBINATION; EFFICIENT; SUPPORT;
D O I
10.1016/j.eswa.2021.116134
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Integrated decision-making about selecting and scheduling a project portfolio can lead to a more desirable performance. This paper considers the problem of selecting a portfolio among a set of possible projects which should be scheduled from vantage point of contractor simultaneously. Each project can be implemented in several modes, each of which has potential cash flows over the time horizon. Therefore, an NPV can be calculated for each project in a particular implementation mode. In this contribution, a structure composed of a fuzzy hybrid multi-criteria method and a fuzzy bi-objective mathematical programming model are presented to deal with quantitative and qualitative dimensions of the project portfolio selection and scheduling problem. To solve the problem, first the qualitative criteria are weighted by the fuzzy AHP, the obtained weights are applied to evaluate the projects in the fuzzy TOPSIS. Then, the fuzzy mathematical model is formulated with two objectives, including maximizing NPV of profit and portfolio score based on assumptions close to real conditions of buildoperate-transfer (BOT) contract. According to the assumptions, projects have multi-period implementation and operation phases; there are a penalty and reward system to meet the deadlines. Also, the company is able to attract external capital. The fuzzy model is converted to its crisp counterpart, and then the model is solved using the augmented epsilon constraint method with the data of an Iranian company as a case-study. The results show that considering multiple modes for project implementation has better results in comparison with confining the implementation of each project to only one mode (the mode with the maximum NPV).
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Selection bias in build-operate-transfer transportation project appraisals
    Xu, Xiangdong
    Chen, Anthony
    Wong, S. C.
    Cheng, Lin
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2015, 75 : 245 - 251
  • [2] Selecting a viable Build-Operate-Transfer (BOT) project to propose
    Jong Ho Ock
    Seung Heon Han
    KSCE Journal of Civil Engineering, 2002, 6 (3) : 203 - 216
  • [3] Optimal selection of build-operate-transfer projects on transportation networks
    Wu, Di
    Yin, Yafeng
    Lawphongpanich, Siriphong
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2011, 45 (10) : 1699 - 1709
  • [4] Build-operate-transfer (BOT): an emerging entry mode for service offshoring
    Orzes, Guido
    Sartor, Marco
    Nassimbeni, Guido
    Fratocchi, Luciano
    PRODUCTION PLANNING & CONTROL, 2017, 28 (04) : 295 - 309
  • [5] The Application of neural network in build-operate-transfer project risk control
    Shen, J. (junxinshen2342342@163.com), 1600, Advanced Institute of Convergence Information Technology (04):
  • [6] Concessionaire selection for build-operate-transfer tunnel projects in Hong Kong
    Zhang, XQ
    Kumaraswamy, MM
    Zheng, W
    Palaneeswaran, E
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (02): : 155 - 163
  • [7] The financial risks in build-operate-transfer projects
    Xenidis, Yiannis
    Angelides, Demos
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (04) : 431 - 441
  • [8] Financing strategies for build-operate-transfer projects
    Schaufelberger, JE
    CONSTRUCTION INNOVATION AND GLOBAL COMPETITIVENESS, VOLS 1 AND 2: THE ORGANIZATION AND MANAGEMENT OF CONSTRUCTION, 2003, : 808 - 818
  • [9] Assessing financial feasibility of a build-operate-transfer project under uncertain demand
    Chen, A
    Subprasom, K
    Chootinan, P
    TRANSPORTATION NETWORK MODELING 2001: PLANNING AND ADMINISTRATION, 2001, (1771): : 124 - 131
  • [10] Selection and application of risk management tools and techniques for build-operate-transfer projects
    Dey, PK
    Ogunlana, SO
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2004, 104 (3-4) : 334 - 346