Assessing financial feasibility of a build-operate-transfer project under uncertain demand

被引:0
|
作者
Chen, A [1 ]
Subprasom, K [1 ]
Chootinan, P [1 ]
机构
[1] Utah State Univ, Dept Civil & Environm Engn, Logan, UT 84322 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The financial feasibility of the build-operate-transfer (BOT) approach, which is being used increasingly by governments in their drive to privatize major public transportation projects, is discussed. A simulation-optimization framework is developed as an assessment tool to evaluate the financial feasibility of BOT projects. It embeds an efficient network optimization solver in a stochastic simulation framework to assess the investment risk of BOT projects under uncertain traffic forecasts. The network optimization solver determines the traffic volumes that will patronize both the BOT links and free links, and the stochastic simulation creates the uncertain traffic forecasts. The simulation-optimization procedure is used to conduct an experiment to estimate the expected profit and its associated probability of making a certain desired profit. These profit forecasts and their probability will help the authorities or the private sector to properly and systematically evaluate BOT investment projects. A case study of the superhighway project of the Pearl River delta in China is used to illustrate the application of the assessment tool developed.
引用
收藏
页码:124 / 131
页数:8
相关论文
共 50 条
  • [1] The financial risks in build-operate-transfer projects
    Xenidis, Yiannis
    Angelides, Demos
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (04) : 431 - 441
  • [2] Flexible build-operate-transfer contracts for road franchising under demand uncertainty
    Tan, Zhijia
    Yang, Hai
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2012, 46 (10) : 1419 - 1439
  • [3] Selecting a viable Build-Operate-Transfer (BOT) project to propose
    Jong Ho Ock
    Seung Heon Han
    [J]. KSCE Journal of Civil Engineering, 2002, 6 (3) : 203 - 216
  • [4] Mean-variance model for the build-operate-transfer scheme under demand uncertainty
    Chen, A
    Subprasom, K
    Ji, ZW
    [J]. TRANSPORTATION NETWORK MODELING 2003: PLANNNING AND ADMINISTRATION, 2003, (1857): : 93 - 101
  • [5] Selection bias in build-operate-transfer transportation project appraisals
    Xu, Xiangdong
    Chen, Anthony
    Wong, S. C.
    Cheng, Lin
    [J]. TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2015, 75 : 245 - 251
  • [6] Pareto-improving toll adjustment for a build-operate-transfer toll road project with unknown demand
    Tan, Zhijia
    Tan, Wei
    [J]. EUROPEAN JOURNAL OF TRANSPORT AND INFRASTRUCTURE RESEARCH, 2014, 14 (01): : 66 - 81
  • [7] Signaling contracts design for Build-Operate-Transfer roads under asymmetric traffic demand information
    Shi, Shasha
    Tuo, Yuhui
    Pan, Meixu
    Yin, Yafeng
    Chen, Yue
    Zhou, Xiongwei
    Chen, Ke
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2024, 183
  • [8] Financing strategies for build-operate-transfer projects
    Schaufelberger, JE
    [J]. CONSTRUCTION INNOVATION AND GLOBAL COMPETITIVENESS, VOLS 1 AND 2: THE ORGANIZATION AND MANAGEMENT OF CONSTRUCTION, 2003, : 808 - 818
  • [9] Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty
    Chen, Anthony
    Subprasom, Kitti
    [J]. TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2007, 41 (06) : 537 - 558
  • [10] Financial Evaluation of Build-Operate-Transfer Projects: A Case Study of Myanmar Ports
    Lin, Khin
    Yang Hua-long
    Banomyong, Ruth
    [J]. 2011 INTERNATIONAL CONFERENCE ON ECONOMIC, EDUCATION AND MANAGEMENT (ICEEM2011), VOL I, 2011, : 254 - 257