Signaling contracts design for Build-Operate-Transfer roads under asymmetric traffic demand information

被引:0
|
作者
Shi, Shasha [1 ]
Tuo, Yuhui [1 ]
Pan, Meixu [1 ]
Yin, Yafeng [2 ]
Chen, Yue [3 ]
Zhou, Xiongwei [1 ]
Chen, Ke [4 ]
机构
[1] Cent South Univ, Business Sch, Changsha 410083, Hunan, Peoples R China
[2] Univ Michigan, Dept Civil & Environm Engn, Ann Arbor, MI 48107 USA
[3] HNCEG Commun Construct Co Ltd, Changsha 410004, Hunan, Peoples R China
[4] Tianjin Univ Technol & Educ, Sch Sci, Tianjin 300222, Peoples R China
基金
中国国家社会科学基金;
关键词
Build-operate-transfer road; Asymmetric information; Signaling game; Potential traffic demand; OPTIMAL CHOICE; PRIVATE; TOLL; CAPACITY; INVESTMENTS; INCENTIVES; PRINCIPAL; MONOPOLY; BEHAVIOR; RETURNS;
D O I
10.1016/j.tre.2024.103465
中图分类号
F [经济];
学科分类号
02 ;
摘要
In a build-operate-transfer (BOT) road project, the government offers a concession contract to a private investor based on traffic demand information. When the government is privately informed about the demand information-namely, the potential traffic demand (PTD)-it might be challenging for the private investor to quantify the project's prospects, which could diminish its enthusiasm for involvement. In that case, the government has incentive to design a concession contract that acts as a signal of facility demand to the private investor. This study uses a signaling model to develop an incentive-compatible BOT contract when the government possesses an informational advantage concerning PTD. We find that the optimal contract for the government under the high-PTD condition is distorted relative to a symmetric-information contract. However, this distortion comes at the cost of social welfare loss, which can be viewed as signaling cost, and it is affected by PTD variation and the marginal social cost of public funds. In a separating equilibrium, optimal contracts lie in one of four regions whose bounds are determined by PTD variation. We further extend the research by considering the private investor's risk-averse attitude. We find that the existence of an optimal signaling mechanism is influenced by the extent of risk aversion (ERA). Interestingly, however, a risk-averse attitude does not magnify the distortion of an asymmetric-information contract, and the signaling cost decreases with ERA. The ranges of separating equilibrium outcomes are also influenced by ERA. Based on our findings, we derive some policy insights regarding BOT contracts design.
引用
收藏
页数:22
相关论文
共 41 条
  • [1] Flexible build-operate-transfer contracts for road franchising under demand uncertainty
    Tan, Zhijia
    Yang, Hai
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2012, 46 (10) : 1419 - 1439
  • [2] Optimal build-operate-transfer road contracts under information asymmetry and uncertainty
    Shi, Shasha
    Yin, Yafeng
    An, Qingxian
    Chen, Ke
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2021, 152 : 65 - 86
  • [3] Optimal choice of capacity, toll and government guarantee for build-operate-transfer roads under asymmetric cost information
    Shi, Shasha
    Yin, Yafeng
    Guo, Xiaolei
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2016, 85 : 56 - 69
  • [4] Effects of asymmetric investment cost information on revenue-compensated build-operate-transfer highway contracts
    Lu, Zhaoyang
    Meng, Qiang
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2023, 172 : 71 - 92
  • [5] Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty
    Chen, Anthony
    Subprasom, Kitti
    [J]. TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2007, 41 (06) : 537 - 558
  • [6] BUILD-OPERATE-TRANSFER CONTRACTS FOR A SINGLE NEW ROAD
    Guo, Xiaolei
    Yang, Hai
    [J]. TRANSPORTATION STUDIES: SUSTAINABLE TRANSPORTATION, PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE OF HONG KONG SOCIETY FOR TRANSPORTATION STUDIES, 2006, : 647 - 656
  • [7] Assessing financial feasibility of a build-operate-transfer project under uncertain demand
    Chen, A
    Subprasom, K
    Chootinan, P
    [J]. TRANSPORTATION NETWORK MODELING 2001: PLANNING AND ADMINISTRATION, 2001, (1771): : 124 - 131
  • [8] Managing urban wastewater in China: a survey of build-operate-transfer contracts
    Braadbaart, Okke
    Zhang, Mingshun
    Wang, Yang
    [J]. WATER AND ENVIRONMENT JOURNAL, 2009, 23 (01) : 46 - 51
  • [9] DESIGNING PARETO EFFICIENT BUILD-OPERATE-TRANSFER CONTRACTS FOR ROAD FRANCHISING
    Tan, Zhijia
    Yang, Hai
    [J]. TRANSPORTATION AND MANAGEMENT SCIENCE, 2008, : 783 - 791
  • [10] Mean-variance model for the build-operate-transfer scheme under demand uncertainty
    Chen, A
    Subprasom, K
    Ji, ZW
    [J]. TRANSPORTATION NETWORK MODELING 2003: PLANNNING AND ADMINISTRATION, 2003, (1857): : 93 - 101