Build-operate-transfer (BOT): an emerging entry mode for service offshoring

被引:5
|
作者
Orzes, Guido [1 ]
Sartor, Marco [2 ]
Nassimbeni, Guido [2 ]
Fratocchi, Luciano [3 ]
机构
[1] Free Univ Bozen Bolzano, Fac Sci & Technol, Bolzano, Italy
[2] Univ Udine, Polytech Dept Engn & Architecture, Udine, Italy
[3] Univ Aquila, Dept Ind & Informat Engn & Econ, Laquila, Italy
关键词
BOT; service offshoring; entry mode; case study; CONCESSIONAIRE SELECTION; CHOICE; PROJECTS; RISKS; PROCUREMENT; INVESTMENT; EXPERIENCE; STRATEGIES; MANAGEMENT; PROTOCOLS;
D O I
10.1080/09537287.2017.1282055
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Build-operate-transfer (BOT) is a well-established solution used in the engineering and construction industries for building different types of infrastructure (e. g. railways, highways, power plants). In recent years, BOT has increasingly been adopted by companies in the service industry as a mode for entering foreign markets. BOT in service offshoring (SO) is characterised by a number of significant peculiarities (e. g. different numbers of involved parties, fee methods, lengths of the concession period), which may call into question the possibility of extending existing findings that relate to infrastructure projects. The aims of this work are as follows: to collect and systematise existing knowledge on engineering and construction BOT projects; to highlight -through an exploratory case study -how these results could be applied to BOT in SO; and to shed light on the factors affecting the choice between different entry modes (including BOT).
引用
收藏
页码:295 / 309
页数:15
相关论文
共 50 条
  • [1] BOT (build-operate-transfer) applications at airports in Turkey
    Kaya, Erguen
    Gerede, Ender
    Basar, Mehmet
    Kuyucak, Ferhan
    Surmeli, Arda
    AMME IDARESI DERGISI, 2007, 40 (02): : 99 - +
  • [2] Selecting a viable Build-Operate-Transfer (BOT) project to propose
    Jong Ho Ock
    Seung Heon Han
    KSCE Journal of Civil Engineering, 2002, 6 (3) : 203 - 216
  • [3] The Build-Operate-Transfer (BOT) Model in Terms of Islamic Law
    Araz, Yunus
    CUMHURIYET ILAHIYAT DERGISI-CUMHURIYET THEOLOGY JOURNAL, 2020, 24 (03): : 1177 - 1198
  • [4] The financial risks in build-operate-transfer projects
    Xenidis, Yiannis
    Angelides, Demos
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (04) : 431 - 441
  • [5] Financing strategies for build-operate-transfer projects
    Schaufelberger, JE
    CONSTRUCTION INNOVATION AND GLOBAL COMPETITIVENESS, VOLS 1 AND 2: THE ORGANIZATION AND MANAGEMENT OF CONSTRUCTION, 2003, : 808 - 818
  • [6] Build-operate-transfer projects as a hybrid mode of market entry: The case of Yavuz Sultan Selim Bridge in Istanbul
    Uner, M. Mithat
    Cavusgil, Erin
    Cavusgil, S. Tamer
    INTERNATIONAL BUSINESS REVIEW, 2018, 27 (04) : 797 - 802
  • [7] Development of a conceptual life cycle performance measurement system for build-operate-transfer (BOT) projects
    Okudan, Ozan
    Budayan, Cenk
    Dikmen, Irem
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (06) : 1635 - 1656
  • [9] Alternate financing strategies for build-operate-transfer projects
    Schaufelberger, JE
    Wipadapisut, I
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (02): : 205 - 213
  • [10] Risks and mitigation measures in build-operate-transfer projects
    Bokharey, Syed Kamarul Bakri Syed Ahmad
    Vallyutham, Kalaikumar
    Potty, Narayanan Sambu
    Bakar, Nabilah Abu
    World Academy of Science, Engineering and Technology, 2010, 4 (03): : 81 - 87