Build-operate-transfer (BOT): an emerging entry mode for service offshoring

被引:5
|
作者
Orzes, Guido [1 ]
Sartor, Marco [2 ]
Nassimbeni, Guido [2 ]
Fratocchi, Luciano [3 ]
机构
[1] Free Univ Bozen Bolzano, Fac Sci & Technol, Bolzano, Italy
[2] Univ Udine, Polytech Dept Engn & Architecture, Udine, Italy
[3] Univ Aquila, Dept Ind & Informat Engn & Econ, Laquila, Italy
关键词
BOT; service offshoring; entry mode; case study; CONCESSIONAIRE SELECTION; CHOICE; PROJECTS; RISKS; PROCUREMENT; INVESTMENT; EXPERIENCE; STRATEGIES; MANAGEMENT; PROTOCOLS;
D O I
10.1080/09537287.2017.1282055
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Build-operate-transfer (BOT) is a well-established solution used in the engineering and construction industries for building different types of infrastructure (e. g. railways, highways, power plants). In recent years, BOT has increasingly been adopted by companies in the service industry as a mode for entering foreign markets. BOT in service offshoring (SO) is characterised by a number of significant peculiarities (e. g. different numbers of involved parties, fee methods, lengths of the concession period), which may call into question the possibility of extending existing findings that relate to infrastructure projects. The aims of this work are as follows: to collect and systematise existing knowledge on engineering and construction BOT projects; to highlight -through an exploratory case study -how these results could be applied to BOT in SO; and to shed light on the factors affecting the choice between different entry modes (including BOT).
引用
收藏
页码:295 / 309
页数:15
相关论文
共 50 条
  • [21] The build-operate-transfer model as an infrastructure privatisation strategy for Turkmenistan
    Durdyev, Serdar
    Ismail, Syuhaida
    UTILITIES POLICY, 2017, 48 : 195 - 200
  • [22] Interface management for China's build-operate-transfer projects
    Chan, WT
    Chen, C
    Messner, JI
    Chua, DKH
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (06) : 645 - 655
  • [23] Royalty models for build-operate-transfer transportation projects with uncertainties
    Chiou, Yu-Chiun
    Lan, Lawrence W.
    TRANSPORTMETRICA, 2006, 2 (03): : 175 - 197
  • [24] Selection bias in build-operate-transfer transportation project appraisals
    Xu, Xiangdong
    Chen, Anthony
    Wong, S. C.
    Cheng, Lin
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2015, 75 : 245 - 251
  • [25] Public Financing into Build-Operate-Transfer Hospital Projects in Italy
    De Marco, Alberto
    Mangano, Giulio
    Cagliano, Anna Corinna
    Grimaldi, Sabrina
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (11) : 1294 - 1302
  • [26] Excess Revenue Allocation for Build-Operate-Transfer Highway Projects
    Song, Jinbo
    Jin, Lulu
    Dong, Wanli
    JOURNAL OF TRANSPORT ECONOMICS AND POLICY, 2016, 50 : 304 - 324
  • [27] Risk management for build-operate-transfer infrastructure projects in China
    Liang, Wen
    Sixth Wuhan International Conference on E-Business, Vols 1-4: MANAGEMENT CHALLENGES IN A GLOBAL WORLD, 2007, : 2646 - 2651
  • [28] Optimal selection of build-operate-transfer projects on transportation networks
    Wu, Di
    Yin, Yafeng
    Lawphongpanich, Siriphong
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2011, 45 (10) : 1699 - 1709
  • [29] An analysis of information disclosure in build-operate-transfer road projects
    Feng, Zhuo
    Gao, Ying
    Song, Jinbo
    He, Qiaochu
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2025, 322 (01) : 292 - 306
  • [30] Improving decision quality: a risk-based go/no-go decision for build-operate-transfer (BOT) projects
    Ock, JH
    Han, SH
    Park, HK
    Diekmann, JE
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2005, 32 (03) : 517 - 532