Solving Fuzzy Time–Cost Trade-Off in Construction Projects Using Linear Programming

被引:3
|
作者
Elkalla I. [1 ]
Elbeltagi E. [1 ]
El Shikh M. [1 ]
机构
[1] Structural Engineering Department, Faculty of Engineering, Mansoura University, Mansoura
关键词
Fuzzy time–cost trade-off; Linear programming; Nearest symmetric trapezoidal fuzzy number; Simplex method;
D O I
10.1007/s40030-020-00489-7
中图分类号
学科分类号
摘要
The time–cost trade-off has been recognized as a very significant aspect of construction management. Generally, time–cost trade-off can be modeled as a fuzzy linear programming problem with symmetric or non-symmetric fuzzy numbers. However, it was successfully solved when the fuzzy membership functions are only symmetric. In the present work, a novel approach is introduced to solve fuzzy linear programming problem with non-symmetric fuzzy membership functions by transforming it to its corresponding nearest symmetric one. The transformed problem is then converted to its crisp linear programming problem and then solved by the standard primal simplex method. Two examples are presented to show the effectiveness of the proposed approach, and the results are discussed. © 2020, The Institution of Engineers (India).
引用
收藏
页码:267 / 278
页数:11
相关论文
共 50 条
  • [31] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023,
  • [32] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    [J]. Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
  • [33] Using genetic algorithms to solve construction time-cost trade-off problems
    Feng, CW
    Liu, LA
    Burns, SA
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1997, 11 (03) : 184 - 189
  • [34] Using genetic algorithms to solve construction time-cost trade-off problems
    Univ of Illinois at Urbana-Champaign, Urbana, United States
    [J]. J Comput Civ Eng, 3 (184-189):
  • [35] Optimization of construction time-cost trade-off analysis using genetic algorithms
    Hegazy, T
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 1999, 26 (06) : 685 - 697
  • [36] Time-cost trade-off optimization model for retrofitting planning projects using MOGA
    Patil A.S.
    Agarwal A.K.
    Sharma K.
    Trivedi M.K.
    [J]. Asian Journal of Civil Engineering, 2024, 25 (5) : 3823 - 3833
  • [37] Time-cost-quality trade-off software by using simplified Genetic algorithm for typical-repetitive construction projects
    Abd El Razek, Refaat H.
    Diab, Ahmed M.
    Hafez, Sherif M.
    Aziz, Remon F.
    [J]. World Academy of Science, Engineering and Technology, 2010, 61 : 312 - 321
  • [38] Multimodal optimization for time-cost trade-off in construction projects using a novel hybrid method based on FA and PSO
    Arlbayrak, Gulcag
    Ozdemir, Ilker
    [J]. REVISTA DE LA CONSTRUCCION, 2018, 17 (02): : 304 - 318
  • [39] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    [J]. Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [40] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    [J]. FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231