共 50 条
- [32] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects [J]. Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
- [34] Using genetic algorithms to solve construction time-cost trade-off problems [J]. J Comput Civ Eng, 3 (184-189):
- [37] Time-cost-quality trade-off software by using simplified Genetic algorithm for typical-repetitive construction projects [J]. World Academy of Science, Engineering and Technology, 2010, 61 : 312 - 321
- [38] Multimodal optimization for time-cost trade-off in construction projects using a novel hybrid method based on FA and PSO [J]. REVISTA DE LA CONSTRUCCION, 2018, 17 (02): : 304 - 318
- [39] New fuzzy models for time-cost trade-off problem [J]. Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231