Emerge of scaling in project schedules

被引:0
|
作者
Vazquez, Alexei [1 ]
机构
[1] Nodes & Links Ltd, Salisbury House,Stn Rd, Cambridge CB1 2LA, England
来源
EUROPEAN PHYSICAL JOURNAL B | 2024年 / 97卷 / 04期
关键词
D O I
10.1140/epjb/s10051-024-00676-6
中图分类号
O469 [凝聚态物理学];
学科分类号
070205 ;
摘要
A project schedule contains a network of activities, the activity durations, the early and late finish dates for each activity, and the associated total float or slack times, the difference between the late and early dates. Here I show that the distribution of activity durations and total floats of construction project schedules exhibit a power law scaling. The power law scaling of the activity durations is explained by a historical process of specialization fragmenting old activities into new activities with shorter duration. In contrast, the power law scaling of the total floats distribution across activities is determined by the activity network. I demonstrate that the power law scaling of the activity duration distribution is essential to obtain a good estimate of the project delay distribution, while the actual total float distribution is less relevant. Finally, using extreme value theory and scaling arguments, I provide a mathematical proof for reference class forecasting for the project delay distribution. The project delay cumulative distribution function is G(Z)=exp(-(Z(e)/z)(1/s)), where s > 0 and Z(c) > 0 are shape and scale parameters. Furthermore, if activity delays follow a lognormal distribution, as the empirical data suggests, then s = 1 and Z(c) similar to N(0.20)d(max)(1+0.20(1-gamma d)), where N is the number of activities, d(max) the maximum activity duration in units of days and gamma(d) the power law exponent of the activity duration distribution. These results offer new insights about project schedules, reference class forecasting and delay risk analysis.
引用
收藏
页数:9
相关论文
共 50 条
  • [41] Financing and reliability analysis for schedules in the project calendar planning problem
    Kazakovtseva, E. A.
    Servakh, V. V.
    AUTOMATION AND REMOTE CONTROL, 2014, 75 (07) : 1231 - 1240
  • [42] A tabu search procedure for developing robust predictive project schedules
    Lambrechts, Olivier
    Demeulemeester, Erik
    Herroelen, Willy
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 111 (02) : 493 - 508
  • [43] Robustness of schedules for project scheduling problem with cash flow optimisation
    Klimek, M.
    Lebkowski, P.
    BULLETIN OF THE POLISH ACADEMY OF SCIENCES-TECHNICAL SCIENCES, 2013, 61 (04) : 1005 - 1015
  • [44] Biological structure and function emerge from scaling unsupervised learning to 250 million protein sequences
    Rives, Alexander
    Meier, Joshua
    Sercu, Tom
    Goyal, Siddharth
    Lin, Zeming
    Liu, Jason
    Guo, Demi
    Ott, Myle
    Zitnick, C. Lawrence
    Ma, Jerry
    Fergus, Rob
    PROCEEDINGS OF THE NATIONAL ACADEMY OF SCIENCES OF THE UNITED STATES OF AMERICA, 2021, 118 (15)
  • [45] Simulating the Balanced Allocation of Project Float to the Critical Path in Network Schedules
    Lucko, Gunnar
    Thompson, Richard C., Jr.
    Su, Yi
    CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 749 - 758
  • [46] Agent-based Modeling and Simulation Framework for Enhanced Project Schedules
    Lazarova-Molnar, Sanja
    20TH INTERNATIONAL CONGRESS ON MODELLING AND SIMULATION (MODSIM2013), 2013, : 887 - 893
  • [48] Preferences of Construction Managers Regarding the Quality and Optimization Criteria of Project Schedules
    Tomczak, Michal
    Jaskowski, Piotr
    SUSTAINABILITY, 2021, 13 (02) : 1 - 24
  • [49] Floating Task: Introducing and Simulating a Higher Degree of Uncertainty in Project Schedules
    Lazarova-Molnar, Sanja
    Mizouni, Rabeb
    19TH IEEE INTERNATIONAL WORKSHOPS ON ENABLING TECHNOLOGIES: INFRASTRUCTURE FOR COLLABORATIVE ENTERPRISES (WETICE 2010), 2010, : 136 - 141
  • [50] THE METHOD FOR IMPROVING STABILITY OF CONSTRUCTION PROJECT SCHEDULES THROUGH BUFFER ALLOCATION
    Jaskowski, Piotr
    Biruk, Slawomir
    TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2011, 17 (03) : 429 - 444