Perceived risk of lock-in in the front-end phase of major transportation projects

被引:0
|
作者
Chantal C. Cantarelli
David Oglethorpe
Bert van Wee
机构
[1] The University of Sheffield,Management School
[2] Cranfield University,Cranfield School of Management
[3] Delft University of Technology,Faculty Technology, Policy and Management
来源
Transportation | 2022年 / 49卷
关键词
Lock-in; Escalation of commitment; Path dependency; Decision-making; Risk perception; Major transportation projects;
D O I
暂无
中图分类号
学科分类号
摘要
Lock-in is defined as the tendency to continue with an inefficient decision or project proposal. The front-end phase is critical to project success, yet most studies have focused on lock-in in the implementation phase. Moreover, little is known about the way in which decision-makers perceive the risk of lock-in. In this paper we identify determinants of lock-in in the front-end phase and we reveal decision-makers’ perceptions of risk of lock-in. Our findings show that risk attitudes towards lock-in vary with the level of risk aversion. However, this is not sufficiently acute to drive the level of regret needed to avoid lock-in. This implies that decision-makers do not accurately assess the risk of lock-in and as such their risk perceptions are a mediating factor in the formation of lock-in. Based on escalation of commitment, path dependency, and prospect theory, the main contribution lies in providing a more comprehensive understanding of lock-in in the front-end phase.
引用
收藏
页码:703 / 733
页数:30
相关论文
共 50 条
  • [21] Conceptualizing, assessing, and managing front-end fuzziness in innovation/NPD projects
    Chang, Sheng-Li
    Chen, Chih-Yuan
    Wey, Shyh-Chyi
    [J]. R & D MANAGEMENT, 2007, 37 (05) : 469 - 478
  • [22] Analysis of the Front-End Loading of Alberta Mega Oil Sands Projects
    Jergeas, George
    [J]. PROJECT MANAGEMENT JOURNAL, 2008, 39 (04) : 95 - 104
  • [23] A Unified Tool to Foster Front-End Planning and Sustainability in Infrastructure Projects
    Ferrer, Valentina
    Pradhananga, Piyush
    Elzomor, Mohamed
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: INFRASTRUCTURE, SUSTAINABILITY, AND RESILIENCE, 2022, : 376 - 385
  • [24] Developing an effective front-end planning framework for sustainable infrastructure projects
    Rahat, Rubaya
    Ferrer, Valentina
    Pradhananga, Piyush
    ElZomor, Mohamed
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (16) : 2841 - 2858
  • [25] Front-end value co-creation in housing development projects
    Candel, Melissa
    Karrbom Gustavsson, Tina
    Eriksson, Per-Erik
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2021, 39 (03) : 245 - 260
  • [26] Low estimates - high stakes: underestimation of costs at the front-end of projects
    Andersen, Bjorn
    Samset, Knut
    Welde, Morten
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2016, 9 (01) : 171 - 193
  • [27] AGATA phase 2 advancements in front-end electronics
    J. Collado
    S. Capra
    A. Pullia
    N. Karkour
    Ch. Houarner
    V. Gonzalez
    G. Wittwer
    A. Boujrad
    M. Kogimtzis
    J. Lawson
    A. Goasduff
    O. Stezowski
    Ch. Bonnin
    L. Charles
    V. Alaphilippe
    N. Dosme
    C. Esnault
    L. Gibelin
    X. Lafay
    E. Legay
    D. Linget
    M. Cahoreau
    D. Sidler
    G. Vinther-Jørgensen
    J. V. Civera
    G. Duchêne
    E. Clément
    I. Lazarus
    A. Gadea
    [J]. The European Physical Journal A, 59
  • [28] Lock-in and its influence on the project performance of large-scale transportation infrastructure projects: investigating the way in which lock-in can emerge and affect cost overruns
    Cantarelli, Chantal C.
    Flyvbjerg, Bent
    van Wee, Bert
    Molin, Eric J. E.
    [J]. ENVIRONMENT AND PLANNING B-PLANNING & DESIGN, 2010, 37 (05): : 792 - 807
  • [29] AGATA phase 2 advancements in front-end electronics
    Collado, J.
    Capra, S.
    Pullia, A.
    Karkour, N.
    Houarner, Ch.
    Gonzalez, V.
    Wittwer, G.
    Boujrad, A.
    Kogimtzis, M.
    Lawson, J.
    Goasduff, A.
    Stezowski, O.
    Bonnin, Ch.
    Charles, L.
    Alaphilippe, V.
    Dosme, N.
    Esnault, C.
    Gibelin, L.
    Lafay, X.
    Legay, E.
    Linget, D.
    Cahoreau, M.
    Sidler, D.
    Vinther-Jorgensen, G.
    Civera, J. V.
    Duchene, G.
    Clement, E.
    Lazarus, I.
    Gadea, A.
    [J]. EUROPEAN PHYSICAL JOURNAL A, 2023, 59 (06):
  • [30] RECEIVER DESIGN CUTS FRONT-END PHASE ERRORS
    SCHMIDT, E
    [J]. MICROWAVES & RF, 1985, 24 (06) : 81 - &