共 50 条
- [32] Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (9-12): : 1153 - 1164
- [34] Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times [J]. The International Journal of Advanced Manufacturing Technology, 2010, 50 : 1153 - 1164
- [36] A note on batch scheduling on a two-machine flowshop with machine-dependent processing times [J]. 4OR, 2023, 21 : 457 - 469
- [37] A note on batch scheduling on a two-machine flowshop with machine-dependent processing times [J]. 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2023, 21 (03): : 457 - 469
- [39] Two-machine flowshop scheduling to minimize total completion time with separate setup and removal times [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2002, 9 (03): : 275 - 286