A note on batch scheduling on a two-machine flowshop with machine-dependent processing times

被引:0
|
作者
Gur Mosheiov
Daniel Oron
机构
[1] The Hebrew University,School of Business Administration
[2] The University of Sydney,The University of Sydney Business School
来源
4OR | 2023年 / 21卷
关键词
Scheduling; Batching; Flow-shop; Makespan; Batch availability; Machine-dependent processing times; 90B35;
D O I
暂无
中图分类号
学科分类号
摘要
We study a batch scheduling problem on a two-machine flowshop. Unlike most relevant research papers focusing on batching with identical job processing times, we assume machine-dependent processing times. The objective function is minimum makespan. For the relaxed version of the problem, where integer batch sizes are not required, we introduce a constant time solution. It consists of: (i) a closed-form expression for the optimal number of batches; and (ii) a geometric sequence of the batch sizes. This optimal non-integer solution is converted into an integer solution by the application of a simple rounding procedure, which runs in O(nlogn) time (where n is the number of jobs).
引用
下载
收藏
页码:457 / 469
页数:12
相关论文
共 50 条
  • [1] A note on batch scheduling on a two-machine flowshop with machine-dependent processing times
    Mosheiov, Gur
    Oron, Daniel
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2023, 21 (03): : 457 - 469
  • [2] Batch Scheduling on Two-Machine Flowshop with Machine-Dependent Setup Times
    Ben-Dati, Lika
    Mosheiov, Gur
    Oron, Daniel
    ADVANCES IN OPERATIONS RESEARCH, 2009, 2009
  • [3] Batch Scheduling on a Two-Machine Jobshop with Machine-Dependent Setup Times
    Mosheiov, Gur
    Oron, Daniel
    NAVAL RESEARCH LOGISTICS, 2011, 58 (07) : 676 - 684
  • [4] Two machine openshop scheduling with machine-dependent processing times
    Vakharia, AJ
    Catay, B
    DISCRETE APPLIED MATHEMATICS, 1997, 73 (03) : 283 - 288
  • [5] Two-machine flowshop scheduling with processing times depending on waiting times
    Wang, Qiuhuan
    Xing, Wenxun
    Proceedings of the Fifth International Conference on Information and Management Sciences, 2006, 5 : 449 - 453
  • [6] A note on scheduling the two-machine flexible flowshop
    Cheng, TCE
    Wang, GQ
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1999, 15 (01): : 187 - 190
  • [7] Two-machine flowshop scheduling with fuzzy processing times and flexible operations
    Uruk, Zeynep
    Yalciner, Ayten Yilmaz
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2024, 18 (01) : 100 - 119
  • [8] Two-machine flowshop scheduling with flexible operations and controllable processing times
    Uruk, Zeynep
    Gultekin, Hakan
    Akturk, M. Selim
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (02) : 639 - 653
  • [9] Scheduling jobs with machine-dependent processing times
    Hung, YF
    Yang, JL
    NINETEENTH IEEE/CPMT INTERNATIONAL ELECTRONICS MANUFACTURING TECHNOLOGY SYMPOSIUM - PROCEEDINGS, 1996 IEMT SYMPOSIUM, 1996, : 42 - 48
  • [10] A two-machine multi-family flowshop scheduling problem with batch processing
    Yang, DL
    Chern, MS
    Wang, JT
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2001, 8 (04): : 289 - 298