共 50 条
- [1] A note on batch scheduling on a two-machine flowshop with machine-dependent processing times 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2023, 21 (03): : 457 - 469
- [5] Two-machine flowshop scheduling with processing times depending on waiting times Proceedings of the Fifth International Conference on Information and Management Sciences, 2006, 5 : 449 - 453
- [6] A note on scheduling the two-machine flexible flowshop IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1999, 15 (01): : 187 - 190
- [9] Scheduling jobs with machine-dependent processing times NINETEENTH IEEE/CPMT INTERNATIONAL ELECTRONICS MANUFACTURING TECHNOLOGY SYMPOSIUM - PROCEEDINGS, 1996 IEMT SYMPOSIUM, 1996, : 42 - 48
- [10] A two-machine multi-family flowshop scheduling problem with batch processing INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2001, 8 (04): : 289 - 298