Two-machine flowshop scheduling with fuzzy processing times and flexible operations

被引:1
|
作者
Uruk, Zeynep [1 ]
Yalciner, Ayten Yilmaz [1 ]
机构
[1] Sakarya Univ, Dept Ind Engn, Sakarya, Turkiye
关键词
scheduling; flowshop; makespan; fuzzy processing times; flexible operations; SINGLE-MACHINE; SHOP; JOHNSONS; JOBS; OPTIMIZATION; ALGORITHM;
D O I
10.1504/EJIE.2024.135387
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers a two-machine flowshop scheduling problem with fuzzy processing times and flexible operations to minimise makespan. The jobs have three operations, one of which is a flexible operation that can be processed on one of the machines. The flexible operation should be assigned to one of the machines. Moreover, the processing times on the machines are not fixed but fuzzy processing times which are assumed to have triangular possibility distributions. Firstly, a possibilistic mathematical model is proposed with fuzzy processing times and then it is converted to an auxiliary crisp model using the weighted average defuzzification method. For the large cases where the exact algorithm may not be efficient, a heuristic algorithm is proposed. [Received: 24 May 2022; Accepted: 18 October 2022]
引用
下载
收藏
页码:100 / 119
页数:21
相关论文
共 50 条
  • [1] Two-machine flowshop scheduling with flexible operations and controllable processing times
    Uruk, Zeynep
    Gultekin, Hakan
    Akturk, M. Selim
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (02) : 639 - 653
  • [2] Two-machine flowshop scheduling with processing times depending on waiting times
    Wang, Qiuhuan
    Xing, Wenxun
    Proceedings of the Fifth International Conference on Information and Management Sciences, 2006, 5 : 449 - 453
  • [3] A note on scheduling the two-machine flexible flowshop
    Cheng, TCE
    Wang, GQ
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1999, 15 (01): : 187 - 190
  • [4] A note on batch scheduling on a two-machine flowshop with machine-dependent processing times
    Mosheiov, Gur
    Oron, Daniel
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2023, 21 (03): : 457 - 469
  • [5] A note on batch scheduling on a two-machine flowshop with machine-dependent processing times
    Gur Mosheiov
    Daniel Oron
    4OR, 2023, 21 : 457 - 469
  • [6] Two-machine flowshop scheduling problem with coupled-operations
    Nadjat Meziani
    Ammar Oulamara
    Mourad Boudhar
    Annals of Operations Research, 2019, 275 : 511 - 530
  • [7] Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times
    Allahverdi, Ali
    Aydilek, Harun
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (21) : 6367 - 6385
  • [8] Two-machine flowshop scheduling problem with coupled-operations
    Meziani, Nadjat
    Oulamara, Ammar
    Boudhar, Mourad
    ANNALS OF OPERATIONS RESEARCH, 2019, 275 (02) : 511 - 530
  • [9] Heuristic for scheduling in a two-machine bicriteria dynamic flowshop with setup and processing times separated
    Su, LH
    Chou, FD
    PRODUCTION PLANNING & CONTROL, 2000, 11 (08) : 806 - 819
  • [10] A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times
    Aydilek, Harun
    Allahverdi, Ali
    APPLIED MATHEMATICAL MODELLING, 2013, 37 (12-13) : 7164 - 7173