On supporting Lean methodologies using constraint-based scheduling

被引:0
|
作者
Roman van der Krogt
John Geraghty
Mustafa Ramzi Salman
James Little
机构
[1] University College Cork,Cork Constraint Computation Centre, Department of Computer Science
[2] Dublin City University,Enterprise Process Research Centre, Mechanical & Manufacturing Engineering
来源
Journal of Scheduling | 2010年 / 13卷
关键词
Lean manufacturing; Constraint programming; Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
Lean Manufacturing—often simply referred to as “Lean”—is a process management philosophy that aims to improve the way in which products are manufactured. It does this through identifying and removing waste and creating a smooth transition between stages in the production process. To a large extent, it relies on visual and simple mechanical aids to assist in improving manufacturing effectiveness. However, when it comes to combining several aspects of Lean or when dealing with complex environments, quantitative modelling becomes essential to achieve the full benefits of Lean.
引用
收藏
页码:301 / 314
页数:13
相关论文
共 50 条
  • [21] Constraint-based proactive scheduling for MPTCP in wireless networks
    Oh, Bong-Hwan
    Lee, Jaiyong
    COMPUTER NETWORKS, 2015, 91 : 548 - 563
  • [22] A CONSTRAINT-BASED SCHEDULING MODEL FOR OPTIMAL TRAIN DISPATCHING
    Rodriguez, Joaquin
    Marliere, Gregory
    Sobieraj, Sonia
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, VOL 2, 2010, : 399 - 406
  • [23] CAMPS: a constraint-based architecturefor multiagent planning and scheduling
    Kazuo Miyashita
    Journal of Intelligent Manufacturing, 1998, 9 : 147 - 154
  • [24] Scheduling of continuous processes using constraint-based search: An application to Branch and Bound
    Rodrigues, LCA
    Carnieri, R
    Neves, F
    EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING - 12, 2002, 10 : 751 - 756
  • [25] A constraint-based method for project scheduling with time windows
    Cesta, A
    Oddi, A
    Smith, SF
    JOURNAL OF HEURISTICS, 2002, 8 (01) : 109 - 136
  • [26] A Constraint-Based Method for Project Scheduling with Time Windows
    Amedeo Cesta
    Angelo Oddi
    Stephen F. Smith
    Journal of Heuristics, 2002, 8 : 109 - 136
  • [27] Constraint-based job shop scheduling with ILOG SCHEDULER
    ILOG S.A., Gentilly, France
    J Heuristics, 4 (271-286):
  • [28] Constraint-Based Winner Determination for Auction-Based Scheduling
    Wang, Chun
    Ghenniwa, Hamada H.
    Shen, Weiming
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 2009, 39 (03): : 609 - 618
  • [29] CAMPS: a constraint-based architecture for multiagent planning and scheduling
    ETL , Ibaraki, Japan
    J Intell Manuf, 2 (147-154):
  • [30] Failure-Directed Search for Constraint-Based Scheduling
    Vilim, Petr
    Laborie, Philippe
    Shaw, Paul
    INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING, 2015, 9075 : 437 - 453