A CONSTRAINT-BASED SCHEDULING MODEL FOR OPTIMAL TRAIN DISPATCHING

被引:0
|
作者
Rodriguez, Joaquin [1 ]
Marliere, Gregory [1 ]
Sobieraj, Sonia [1 ]
机构
[1] Univ Lille Nord France, French Natl Inst Transport & Safety Res INRETS, F-59666 Villeneuve Dascq, France
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Railway networks are faced to an increase demand of new services. This situation leads to train schedules close to the maximum capacity of the infrastructure. As the extension of the infrastructure is too expensive, an alternative solution is to improve traffic management in congested areas. This task can be formulated as an optimization problem which is a joint scheduling and allocation problems. The problem is considered to be a NP-hard problem which makes it difficult to solve using exact methods for a reasonable problem size. In this paper, we compare two heuristic methods for solving the problem. The first one uses a two-phase approach to perform independently resource allocation and scheduling. The second one performs incrementally the two kind of decisions at track section level, i.e. at each step, the algorithm performs decisions of allocation of a track section or of scheduling a pair of train runs on this section.
引用
收藏
页码:399 / 406
页数:8
相关论文
共 50 条
  • [1] Constraint-based scheduling
    Fromherz, MPJ
    [J]. PROCEEDINGS OF THE 2001 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2001, : 3231 - 3244
  • [2] Tackling Train Routing via Multi-agent Pathfinding and Constraint-based Scheduling
    Svancara, Jiri
    Bartak, Roman
    [J]. ICAART: PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON AGENTS AND ARTIFICIAL INTELLIGENCE - VOL 1, 2022, : 306 - 313
  • [3] LEARNING TO IMPROVE CONSTRAINT-BASED SCHEDULING
    ZWEBEN, M
    DAVIS, E
    DAUN, B
    DRASCHER, E
    DEALE, M
    ESKEY, M
    [J]. ARTIFICIAL INTELLIGENCE, 1992, 58 (1-3) : 271 - 296
  • [4] A Constraint-Based Framework for Scheduling Problems
    Wikarek, Jaroslaw
    Sitek, Pawel
    Stefanski, Tadeusz
    [J]. INTELLIGENT INFORMATION AND DATABASE SYSTEMS, ACIIDS 2018, PT I, 2018, 10751 : 419 - 430
  • [5] Constraint-based scheduling:: An introduction for newcomers
    Barták, R
    [J]. INTELLIGENT MANUFACTURING SYSTEMS 2003, 2003, : 69 - 74
  • [6] A constraint-based interactive train rescheduling tool
    Chiu C.K.
    Chou C.M.
    Lee J.H.M.
    Leung H.F.
    Leung Y.W.
    [J]. Constraints, 2002, 7 (02) : 167 - 198
  • [7] An object-oriented, constraint-based heuristic for a class of passenger-train scheduling problems
    Isaai, MT
    Singh, MG
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 2000, 30 (01): : 12 - 21
  • [8] Constraint-based model for the cyclic multi-hoists scheduling problem
    Manier, MA
    Varnier, C
    Baptiste, P
    [J]. PRODUCTION PLANNING & CONTROL, 2000, 11 (03) : 244 - 257
  • [9] Completable partial solutions in constraint programming and constraint-based scheduling
    Kovács, A
    Váncza, J
    [J]. PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING - CP 2004, PROCEEDINGS, 2004, 3258 : 332 - 346
  • [10] Scheduling of maintenance work: A constraint-based approach
    Palma, J.
    de Leon Hijes, F. C. Gomez
    Campos Martinez, M.
    Guillen Carceles, L.
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (04) : 2963 - 2973