A CONSTRAINT-BASED SCHEDULING MODEL FOR OPTIMAL TRAIN DISPATCHING

被引:0
|
作者
Rodriguez, Joaquin [1 ]
Marliere, Gregory [1 ]
Sobieraj, Sonia [1 ]
机构
[1] Univ Lille Nord France, French Natl Inst Transport & Safety Res INRETS, F-59666 Villeneuve Dascq, France
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Railway networks are faced to an increase demand of new services. This situation leads to train schedules close to the maximum capacity of the infrastructure. As the extension of the infrastructure is too expensive, an alternative solution is to improve traffic management in congested areas. This task can be formulated as an optimization problem which is a joint scheduling and allocation problems. The problem is considered to be a NP-hard problem which makes it difficult to solve using exact methods for a reasonable problem size. In this paper, we compare two heuristic methods for solving the problem. The first one uses a two-phase approach to perform independently resource allocation and scheduling. The second one performs incrementally the two kind of decisions at track section level, i.e. at each step, the algorithm performs decisions of allocation of a track section or of scheduling a pair of train runs on this section.
引用
收藏
页码:399 / 406
页数:8
相关论文
共 50 条
  • [21] Constraint-based search for optimal Golomb rulers
    Polash, M. M. A.
    Newton, M. A. H.
    Sattar, A.
    JOURNAL OF HEURISTICS, 2017, 23 (06) : 501 - 532
  • [22] Constraint-based proactive scheduling for MPTCP in wireless networks
    Oh, Bong-Hwan
    Lee, Jaiyong
    COMPUTER NETWORKS, 2015, 91 : 548 - 563
  • [23] CAMPS: a constraint-based architecturefor multiagent planning and scheduling
    Kazuo Miyashita
    Journal of Intelligent Manufacturing, 1998, 9 : 147 - 154
  • [24] Embedded System Verification Through Constraint-Based Scheduling
    El-Mahi, Olfat
    Pesant, Gilles
    Nicolescu, Gabriela
    Beltrame, Giovanni
    RAPID SYSTEM PROTOTYPING: SHORTENING THE PATH FROM SPECIFICATION TO PROTOTYPE (RSP 2013), 2013, : 73 - 79
  • [25] A CONSTRAINT-BASED PERSPECTIVE IN RESOURCE CONSTRAINED PROJECT SCHEDULING
    ULUSOY, G
    OZDAMAR, L
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (03) : 693 - 705
  • [26] On supporting Lean methodologies using constraint-based scheduling
    van der Krogt, Roman
    Geraghty, John
    Salman, Mustafa Ramzi
    Little, James
    JOURNAL OF SCHEDULING, 2010, 13 (04) : 301 - 314
  • [27] A constraint-based method for project scheduling with time windows
    Cesta, A
    Oddi, A
    Smith, SF
    JOURNAL OF HEURISTICS, 2002, 8 (01) : 109 - 136
  • [28] A Constraint-Based Method for Project Scheduling with Time Windows
    Amedeo Cesta
    Angelo Oddi
    Stephen F. Smith
    Journal of Heuristics, 2002, 8 : 109 - 136
  • [29] Constraint-based job shop scheduling with ILOG SCHEDULER
    ILOG S.A., Gentilly, France
    J Heuristics, 4 (271-286):
  • [30] Constraint-Based Winner Determination for Auction-Based Scheduling
    Wang, Chun
    Ghenniwa, Hamada H.
    Shen, Weiming
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 2009, 39 (03): : 609 - 618