共 50 条
- [43] Movement of roof strata in extra-thick coal seams in top-coal caving mining based on a high precision micro-seismic monitoring system [J]. Beijing Keji Daxue Xuebao/Journal of University of Science and Technology Beijing, 2010, 32 (05): : 552 - 558
- [44] The abutment pressure distribution of extremely thick seam top coal caving longwall panel: A case study [J]. PROGRESS IN MINE SAFETY SCIENCE AND ENGINEERING II, 2014, : 827 - 829
- [46] Structure coupling between hydraulic roof support and surrounding rock in extra-thick and hard coal seam with super large cutting height and longwall top coal caving operation [J]. Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (06): : 1666 - 1678
- [47] Ground control of narrow coal pillar in gob side entry driving with fully mechanized top coal caving mining in extra-thick coal seam [J]. Journal of Mining and Strata Control Engineering, 2021, 3 (03):
- [48] Modeling Top Coal Disintegration in Thick Seams in Longwall Top Coal Caving [J]. Journal of Mining Science, 2019, 55 : 247 - 256
- [49] Front Stress Distribution Under the Impact of Cutting Height to Caving Height Ratio in Extra-thick Longwall Top Coal Caving Technology [J]. INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY, 2020, 1 (02): : 123 - 129
- [50] Floor failure law of extra-thick coal seam in fully mechanized caving mining [J]. Meitiandizhi Yu Kantan/Coal Geology and Exploration, 2022, 50 (08): : 107 - 115