Business Process Reengineering and Flexibility: A Case for Unification

被引:0
|
作者
Guy Fitzgerald
Feroz A. Siddiqui
机构
[1] Brunel University,Department of Information Systems and Computing
关键词
business process reengineering; flexibility; adaptability; organization and strategy; information systems;
D O I
暂无
中图分类号
学科分类号
摘要
Business process reengineering (BPR) offers a radical approach to improving the performance of an organization. However, although there have been successes BPR is recognized as a high-risk activity, prone to failure. There are a variety of reasons for this and this paper highlights one which is argued to be the lack of attention that BPR pays to flexibility and its inability to cope with a changing environment. The purpose of this article is to raise the issue of flexibility within BPR and an approach is taken that examines flexibility in other business functional areas, such as manufacturing, architecture, information systems, and organizational strategy, where there is an extensive literature that indicates the importance of flexibility. The lessons from these other areas are identified and some of the implications for BPR are highlighted. A number of proposals are made including the suggestion that a form of “flexibility analysis” be adopted as a stage in BPR projects. It is argued that this would help to move the focus of a BPR project away from the current requirements toward a longer term, more flexible, enduring set of requirements. Flexibility analysis also ensures analysis of the kinds of changes that might be required over time, and how such change could be accommodated in the reengineered processes.
引用
收藏
页码:73 / 86
页数:13
相关论文
共 50 条
  • [31] Reengineering the business process at the strategic level
    Almeida, LT
    MODELLING TECHNIQUES FOR BUSINESS PROCESS RE-ENGINEERING AND BENCHMARKING, 1997, : 144 - 155
  • [32] Business process reengineering: Modelling and analysis
    Gunasekaran, A
    Ichimura, T
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 50 (2-3) : 65 - 68
  • [33] CSCW AS OPPORTUNITY FOR BUSINESS PROCESS REENGINEERING
    HUTCHISON, A
    BUSINESS PROCESS RE-ENGINEERING: INFORMATION SYSTEMS OPPORTUNITIES AND CHALLENGES, 1994, 54 : 309 - 318
  • [34] Data mining for business process reengineering
    Lee, TE
    Otondo, R
    Kim, BO
    ISSUES AND TRENDS OF INFORMATION TECHNOLOGY MANAGEMENT IN CONTEMPORARY ORGANIZATIONS, VOLS 1 AND 2, 2002, : 318 - 322
  • [35] Business process reengineering with standard software
    Huttner, Werner
    Kernler, Helmut
    Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 1996, 91 (05): : 212 - 215
  • [37] The implication of Chinese Business Process Reengineering
    Fei, YP
    Cai, L
    98 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, PROCEEDINGS, 1998, : 633 - 637
  • [38] Business process reengineering of a supply chain and a traceability system: A case study
    Bevilacqua, M.
    Ciarapica, F. E.
    Giacchetta, G.
    JOURNAL OF FOOD ENGINEERING, 2009, 93 (01) : 13 - 22
  • [39] BUSINESS PROCESS REENGINEERING (BPR): FUTURE OR PAST OF THE BUSINESS?
    Myszak, Justyna Maria
    MANAGEMENT THEORY AND STUDIES FOR RURAL BUSINESS AND INFRASTRUCTURE DEVELOPMENT, 2011, 26 : 169 - 176
  • [40] Business Process Reengineering-A Case Study on Computer Center Service
    Phiphopsuthipaiboon, Soontorn
    Boonsiri, Somjai
    2016 5TH INTERNATIONAL CONFERENCE ON TRANSPORTATION AND TRAFFIC ENGINEERING (ICTTE 2016), 2016, 81