Lean system design for engineer-to-order manufacturing

被引:3
|
作者
Zhou J. [1 ]
Zhang Q. [1 ]
Wang X. [1 ]
Xiao H. [1 ]
机构
[1] College of Mechanical Engineering, Tongji University, Shanghai
关键词
design of experiment (DOE); engineer-to-order (ETO); implementation path; improved value stream mapping (IVSM); simulation optimization;
D O I
10.1007/s12204-016-1784-2
中图分类号
学科分类号
摘要
A five-step method framework is proposed by combing improved value stream mapping with simulation and design of experiment (DOE) to design the lean system for engineer-to-order (ETO) manufacturing, and lean practice implementation path is decided. Meanwhile, a real company case like HAVC is taken to display the application of the framework. The results indicate that compared to supermarket Kanban, constant work in process (Conwip) has the broader applicability in ETO manufacturing and the critical business process, like purchasing of key parts, and has more significant effects on value stream performance. Therefore, it should have priority in lean practice implementation. © 2016, Shanghai Jiaotong University and Springer-Verlag Berlin Heidelberg.
引用
收藏
页码:702 / 712
页数:10
相关论文
共 50 条
  • [31] Modeling of modularity and scaling for integration of customer in design of engineer-to-order products
    Siddique, Z
    Ninan, JA
    [J]. INTEGRATED COMPUTER-AIDED ENGINEERING, 2006, 13 (02) : 133 - 148
  • [32] Towards engineer-to-order product configuration
    Xie, H
    Lau, F
    [J]. COMPUTER APPLICATIONS IN INDUSTRY AND ENGINEERING, 2002, : 180 - 184
  • [33] Principles for the design and operation of engineer-to-order supply chains in the construction sector
    Gosling, Jonathan
    Towill, Denis R.
    Naim, Mohamed M.
    Dainty, Andrew R. J.
    [J]. PRODUCTION PLANNING & CONTROL, 2015, 26 (03) : 203 - 218
  • [34] PRODUCTION CONTROL IN ENGINEER-TO-ORDER FIRMS
    BERTRAND, JWM
    MUNTSLAG, DR
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 30-1 : 3 - 22
  • [35] Performance measurement in design engineering: A case study in an engineer-to-order company
    Sousa, GWL
    Venuto, JJ
    Coelho, RA
    Van Aken, EM
    [J]. ENGINEERING MANAGEMENT: IT'S ABOUT PEOPLE, PROCEEDINGS, 2001, : 364 - 373
  • [36] A grammatical approach for real-time design of engineer-to-order products
    Siddique, Zahed
    Ninan, Jiju A.
    [J]. JOURNAL OF ENGINEERING DESIGN, 2007, 18 (02) : 157 - 174
  • [37] Operationalizing lean principles for lead time reduction in engineer-to-order (ETO) operations: A case study
    Strandhagen, Jo W.
    Vallandingham, Logan R.
    Alfnes, Erlend
    Strandhagen, Jan Ola
    [J]. IFAC PAPERSONLINE, 2018, 51 (11): : 128 - 133
  • [38] A conceptual framework for a ubiquitous autonomous work system in the Engineer-To-Order environment
    Damir Husejnagić
    Alojzij Sluga
    [J]. The International Journal of Advanced Manufacturing Technology, 2015, 78 : 1971 - 1988
  • [39] Project Time Deployment: a new lean tool for losses analysis in Engineer-to-Order production environments
    Bertolini, Massimo
    Braglia, Marcello
    Marrazzini, Leonardo
    Neroni, Mattia
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (10) : 3129 - 3146
  • [40] The System Dynamics of Engineer-to-Order Construction Projects: Past, Present, and Future
    Zhou, Yuxuan
    Wang, Xun
    Gosling, Jonathan
    Naim, Mohamed M.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (05)