Project Time Deployment: a new lean tool for losses analysis in Engineer-to-Order production environments

被引:12
|
作者
Bertolini, Massimo [1 ]
Braglia, Marcello [2 ]
Marrazzini, Leonardo [2 ]
Neroni, Mattia [3 ]
机构
[1] Univ Modena & Reggio Emilia, Enzo Ferrari Engn Dept, Modena, Italy
[2] Univ Pisa, Dept Civil & Ind Engn, Pisa, Italy
[3] Univ Parma, Dept Engn & Architecture, Parma, Italy
关键词
Lean Manufacturing; Engineer-to-Order; Manufacturing Cost Deployment; Manufacturing Critical-path Time; Quick Response Manufacturing; Automated Storage and Retrieval System;
D O I
10.1080/00207543.2021.1912428
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a novel lean tool called Project Time Deployment (PTD) whose objectives are to classify, analyse, and eliminate losses in order to reduce production lead time in Engineer-to-Order (ETO) environments. By combining two already known approaches, i.e. the Manufacturing Critical-path Time and the Manufacturing Cost Deployment, PTD identifies the critical losses affecting the project, focusing on the business processes where causal losses occur, and providing opportunities for greater efficiency and effectiveness by reducing or even eliminating them. In ETO projects, the lead time and respecting deadlines are of paramount importance and they are often threatened by several different losses that are difficult to compare. Companies thus need a tool to identify the losses and the tasks where they occur, quantifying them in terms of a single dimension: the time. PTD was designed using a methodology based on four steps: analysis of current solutions, concept design and prototype, proof of concept and validation, and definition of future researches. It was also validated in an industrial implementation concerning an Engineering, Procurement & Construction company operating in the steel industry, and led to an approximate 24% reduction in lead time.
引用
收藏
页码:3129 / 3146
页数:18
相关论文
共 19 条
  • [1] Lean manufacturing tool in engineer-to-order environment: Project cost deployment
    Braglia, Marcello
    Frosolini, Marco
    Gallo, Mose
    Marrazzini, Leonardo
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (06) : 1825 - 1839
  • [2] TAKT TIME AS A LEVER TO INTRODUCE LEAN PRODUCTION IN MIXED ENGINEER-TO-ORDER/MAKE-TO-ORDER MACHINE TOOL MANUFACTURING COMPANIES
    Ricondo Iriondo, Itziar
    Serrano Lasa, Ibon
    De Castro Vila, Rodolfo
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2016, 23 (02): : 94 - 107
  • [3] Takt time as a lever to introduce lean production in mixed engineer-to-order/make-to-order machine tool manufacturing companies
    [J]. Serrano Lasa, Ibon (iserrano@ideko.es), 1600, University of Cincinnati (23):
  • [4] A New Set of Principles for Pursuing the Lean Ideal in Engineer-to-Order Manufacturers
    Powell, Daryl
    Strandhagen, Jan Ola
    Tommelein, Iris
    Ballard, Glenn
    Rossi, Monica
    [J]. VARIETY MANAGEMENT IN MANUFACTURING: PROCEEDINGS OF THE 47TH CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2014, 17 : 571 - 576
  • [5] Lean and Industry 4.0 mitigating common losses in Engineer-to-Order theory and practice: an exploratory study
    Schulze, Felix
    Dallasega, Patrick
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2024, 36 (03) : 780 - 820
  • [6] Overall Task Effectiveness: a new Lean performance indicator in engineer-to-order environment
    Braglia, Marcello
    Gabbrielli, Roberto
    Marrazzini, Leonardo
    [J]. INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2019, 68 (02) : 407 - 422
  • [7] A Lean Approach for Real-Time Planning and Monitoring in Engineer-to-Order Construction Projects
    Dallasega, Patrick
    Rauch, Erwin
    Frosolini, Marco
    [J]. BUILDINGS, 2018, 8 (03)
  • [8] Overall Construction Productivity: a new lean metric to identify construction losses and analyse their causes in Engineer-to-Order construction supply chains
    Braglia, Marcello
    Dallasega, Patrick
    Marrazzini, Leonardo
    [J]. PRODUCTION PLANNING & CONTROL, 2022, 33 (9-10) : 925 - 942
  • [9] Operationalizing lean principles for lead time reduction in engineer-to-order (ETO) operations: A case study
    Strandhagen, Jo W.
    Vallandingham, Logan R.
    Alfnes, Erlend
    Strandhagen, Jan Ola
    [J]. IFAC PAPERSONLINE, 2018, 51 (11): : 128 - 133
  • [10] A New Value Stream Mapping Approach for Engineer-to-Order Production Systems
    Thomassen, Maria Kollberg
    Alfnes, Erlend
    Gran, Erik
    [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE PRODUCTION MANAGEMENT TOWARDS SUSTAINABLE GROWTH (AMPS 2015), PT II, 2015, 460 : 207 - 214