Stability analysis of super-large-section tunnel in loess ground considering water infiltration caused by irrigation

被引:0
|
作者
Yanbin Luo
Jianxun Chen
Shutong Gao
Xianghui Deng
Pengsheng Diao
机构
[1] Chang’an University,School of Highway
[2] Guangzhou Metro Design and Research Institute Co.,College of Civil and Architecture Engineering
[3] Ltd.,undefined
[4] Xi’an Technological University,undefined
来源
关键词
Large-section loess tunnel; Irrigation; Infiltration; Water content; Plastic zone; Stability analysis;
D O I
暂无
中图分类号
学科分类号
摘要
Constructing a super-large-section loess tunnel under the irrigation area is a highly challenging task. One reason is that the strength of the loess decreases when it is soaked, which endangers the safety and stability of tunnels. In this paper, Majiazhuang tunnel is selected as a project case which provides in situ monitoring and measuring data, and Midas GTS NX software is used to build a tunnel structural calculation model under the coupled function of seepage and stress fields. Combined with the change law of physical and mechanical property for unsaturated loess, simulations are performed under different situations, which include the surface infiltration, the integral soaking, and partial soaking caused by concentrated infiltration. The results of in situ monitoring show that the complete structure of super-large-section tunnel buried at 50 m depth below the clayey loess was effected negligibly by irrigation and heavy rainfall, and it is stable during irrigation and heavy rainfall. The results of simulation show that when the integrity of the farmland topsoil is good and the weak structural planes, cracks, and fractures do not exist, the effective depth of irrigation water in Q3 clayed loess is 4 m approximately; when the tunnel soil layer is integral soaked, the moisture content of the Q2 silty clay loess increases from 16.6 to 20.5% and becomes saturated at the moisture content of 24.3%. The crown settlement, ground surface settlement, thickness and strain of the plastic zone significantly rise, and they slowly increase in the early stages while rapidly increase in the later stages. In addition, the rate of increase in the later stages is approximately 9.6 times faster than that in the early stages; when the crown, upper arch, and side wall are partial concentrated soaked, the thickness of plastic deformation zone at the crown has the most significant effect. The thickness of plastic deformation zone at the crown increased more than 100%, at the other two positions both have approximately 40% increasement compared with that without irrigation water. It indicates that the irrigation water infiltrates to the tunnel soil layer, the structural stability of the tunnel is affected by the surface irrigation, and the partial soaking at the upper crown has the greatest effect on the stability of the tunnel structure.
引用
收藏
相关论文
共 50 条
  • [41] Numerical analysis on stability of modifying support of large cross-section tunnel in shallow expansive soil
    Shandong Provincial Key Laboratory of Civil Engineering Disaster Prevention and Mitigation, Shandong University of Science and Technology, Qingdao
    266 590, China
    不详
    266 590, China
    不详
    250 061, China
    J Mines Met Fuels, 10 (294-303): : 294 - 303
  • [42] Evolution of Ground Settlement and Support System Behavior During Benching Excavation of a Tunnel with Super Large Cross Section: A Field Monitoring Case Study
    Shi, Youzhi
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (14): : 4779 - 4798
  • [43] Ground Settlement of New Artificial Filling Soil Layer Induced by Constructing Tunnel with Super Large Cross-Section and Its Control Measures
    Wen Y.
    Zhang J.
    Wu J.
    Gao Y.
    Zhongguo Tiedao Kexue/China Railway Science, 2017, 38 (06): : 79 - 86
  • [44] Study on Field Test of Deformation and Stability Control Technology for Shallow Unsymmetrical Loading Section of Super-Large-Span Tunnel Portal
    Wan, Li
    Luo, Yanbin
    Zhang, Changan
    Tian, Chaopeng
    Shao, Xing
    Liu, Zhen
    APPLIED SCIENCES-BASEL, 2024, 14 (13):
  • [45] Analysis of Tunnel Water Inrush Considering the Influence of Surrounding Rock Permeability Coefficient by Excavation Disturbance and Ground Stress
    Fu, Helin
    An, Pengtao
    Chen, Long
    Cheng, Guowen
    Li, Jie
    Yu, Xiaohui
    APPLIED SCIENCES-BASEL, 2021, 11 (08):
  • [46] Numerical simulation analysis of the stability of the construction face of a super long tunnel under conditions of precipitation and abundant water
    Dun, Huoda
    Chen, Song
    Liu, Haitao
    Chen, Chen
    Zhang, Yuansheng
    Yuan, Ying
    FRONTIERS IN MATERIALS, 2024, 11
  • [47] Three-dimensional limit analysis method for excavation surface stability of rectangular pipe jacking tunnel with large section
    Ding, Jiahao
    Peng, Limin
    Lei, Mingfeng
    Zhu, Licheng
    Tang, Zhihui
    Journal of Railway Science and Engineering, 2022, 19 (08) : 2369 - 2380
  • [48] Analysis of mechanism of mid-partition eccentric compression and construction effect on super-large section multi-arch tunnel
    Xu, Chongbang
    Xia, Caichu
    Wang, Hualao
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2010, 29 (SUPPL. 1): : 2819 - 2826
  • [49] Analysis of mechanical response of four-lane small clear spacing highway tunnel with super-large cross-section
    Dalian Municipal Design and Research Institute Co. Ltd, Dalian
    116013, China
    Tumu Gongcheng Xuebao, (302-305):
  • [50] Upper limit analysis of stability of the water-resistant rock mass of a Karst tunnel face considering the seepage force
    Wenlong Wu
    Xiliang Liu
    Jiaqi Guo
    Feiyue Sun
    Xin Huang
    Zhengguo Zhu
    Bulletin of Engineering Geology and the Environment, 2021, 80 : 5813 - 5830