Stability analysis of super-large-section tunnel in loess ground considering water infiltration caused by irrigation

被引:0
|
作者
Yanbin Luo
Jianxun Chen
Shutong Gao
Xianghui Deng
Pengsheng Diao
机构
[1] Chang’an University,School of Highway
[2] Guangzhou Metro Design and Research Institute Co.,College of Civil and Architecture Engineering
[3] Ltd.,undefined
[4] Xi’an Technological University,undefined
来源
关键词
Large-section loess tunnel; Irrigation; Infiltration; Water content; Plastic zone; Stability analysis;
D O I
暂无
中图分类号
学科分类号
摘要
Constructing a super-large-section loess tunnel under the irrigation area is a highly challenging task. One reason is that the strength of the loess decreases when it is soaked, which endangers the safety and stability of tunnels. In this paper, Majiazhuang tunnel is selected as a project case which provides in situ monitoring and measuring data, and Midas GTS NX software is used to build a tunnel structural calculation model under the coupled function of seepage and stress fields. Combined with the change law of physical and mechanical property for unsaturated loess, simulations are performed under different situations, which include the surface infiltration, the integral soaking, and partial soaking caused by concentrated infiltration. The results of in situ monitoring show that the complete structure of super-large-section tunnel buried at 50 m depth below the clayey loess was effected negligibly by irrigation and heavy rainfall, and it is stable during irrigation and heavy rainfall. The results of simulation show that when the integrity of the farmland topsoil is good and the weak structural planes, cracks, and fractures do not exist, the effective depth of irrigation water in Q3 clayed loess is 4 m approximately; when the tunnel soil layer is integral soaked, the moisture content of the Q2 silty clay loess increases from 16.6 to 20.5% and becomes saturated at the moisture content of 24.3%. The crown settlement, ground surface settlement, thickness and strain of the plastic zone significantly rise, and they slowly increase in the early stages while rapidly increase in the later stages. In addition, the rate of increase in the later stages is approximately 9.6 times faster than that in the early stages; when the crown, upper arch, and side wall are partial concentrated soaked, the thickness of plastic deformation zone at the crown has the most significant effect. The thickness of plastic deformation zone at the crown increased more than 100%, at the other two positions both have approximately 40% increasement compared with that without irrigation water. It indicates that the irrigation water infiltrates to the tunnel soil layer, the structural stability of the tunnel is affected by the surface irrigation, and the partial soaking at the upper crown has the greatest effect on the stability of the tunnel structure.
引用
收藏
相关论文
共 50 条
  • [31] Discontinuous deformation analysis of super section tunnel surrounding rock stability based on joint distribution simulation
    He, Peng
    Li, Shu-cai
    Li, Li-ping
    Zhang, Qian-qing
    Xu, Fei
    Chen, Yun-juan
    COMPUTERS AND GEOTECHNICS, 2017, 91 : 218 - 229
  • [32] Reliable stability analysis of surrounding rock for super section tunnel based on digital characteristics of joint information
    He, Peng
    Wang, Gang
    Sun, Shangqu
    Li, Weiteng
    Jiang, Feng
    Zheng, Chengcheng
    GEOMATICS NATURAL HAZARDS & RISK, 2020, 11 (01) : 1528 - 1541
  • [33] Mechanics analysis and structure design of river-crossing shield tunnel of super-large section
    Li, Wei
    He, Chuan
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2007, 20 (03): : 76 - 80
  • [34] Construction Stability Analysis and Field Monitoring of Shallowly Buried Large-Section Tunnels in Loess Strata
    Zheng, Fang
    Li, Wenqiang
    Song, Zhanping
    Wang, Jiahui
    Zhang, Yuwei
    Liu, Naifei
    Xiao, Kehui
    Wang, Yan
    WATER, 2024, 16 (15)
  • [35] Analysis of the Causes of the Collapse of a Deep-Buried Large Cross-Section of Loess Tunnel and Evaluation of Treatment Measures
    Wang, Dengke
    Luo, Jianjun
    Shen, Kaiming
    Gao, Liping
    Li, Feilong
    Wang, Lei
    APPLIED SCIENCES-BASEL, 2022, 12 (01):
  • [36] Stability Analysis and Protection Measures of Large Section Tunnel in Coal Rich Weak Rock Stratum
    Zhou, Guannan
    Zhao, Zijiang
    Song, Zhanping
    Wang, Hongjian
    GEOFLUIDS, 2021, 2021
  • [37] Stability Analysis During the Construction of Large Cross-section Tunnel Through Contact Belt
    Dai, Shun-hong
    INTERNATIONAL CONFERENCE ON MATERIAL SCIENCE AND CIVIL ENGINEERING, MSCE 2016, 2016, : 469 - 474
  • [38] Slope Stability Analysis Method of Unsaturated Soil Slopes Considering Pore Gas Pressure Caused by Rainfall Infiltration
    Tian, Wenjing
    Peiffer, Herman
    Malengier, Benny
    Xue, Song
    Chen, Zhongtian
    APPLIED SCIENCES-BASEL, 2022, 12 (21):
  • [39] Stability analysis of a 3D shallow tunnel face considering the inclined excavation and inclined ground surface
    Cheng, Xiao
    Li, Dejian
    Li, Hekai
    Peng, Xinyan
    Zhao, Lianheng
    Zhao, Weiyang
    COMPUTERS AND GEOTECHNICS, 2024, 165
  • [40] Stability Evaluation Method of Large Section Tunnel Considering Modification of Cover-Span Ratio under Mechanized Operation Condition
    Zhang J.
    Liu Y.
    Yan B.
    Zhongguo Tiedao Kexue/China Railway Science, 2022, 43 (01): : 92 - 100