A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules

被引:0
|
作者
Pasquale Legato
Roberto Trunfio
机构
[1] Università della Calabria,Dipartimento di Ingegneria Informatica, Modellistica, Elettronica e Sistemistica
来源
4OR | 2014年 / 12卷
关键词
Scheduling; Local branching; Branch & bound; Unidirectional schedules; 68M20; 90C57;
D O I
暂无
中图分类号
学科分类号
摘要
The quay crane scheduling problem (QCSP) is at the basis of a major logistic process in maritime container terminals: the process of discharging/loading containers from/on berthed vessels. Several groups of containers, laying in one or more stowage portions of a containership, have to be assigned to multiple cranes and discharge/loading operations have to be optimally sequenced, under some complicating constraints imposed by the practical working rules of quay cranes. The QCSP has been the object of a great deal of research work since the last decade and it is focused in this paper, with the aim of consolidating a promising solution approach based upon the combination of specialized branch & bound (B&B) and heuristic algorithms. A cost-effective solution technique that incorporates the local branching method within a refined B&B algorithm is proposed and its effectiveness is assessed by numerical comparisons against the latest algorithm available in literature.
引用
收藏
页码:123 / 156
页数:33
相关论文
共 50 条
  • [21] Some complexity results and an efficient algorithm for quay crane scheduling problem
    Liu, Ming
    Wang, Shijin
    Chu, Feng
    Xu, Yinfeng
    DISCRETE MATHEMATICS ALGORITHMS AND APPLICATIONS, 2016, 8 (04)
  • [22] A heuristic for the quay crane scheduling problem based on contiguous bay crane operations
    Lu, Zhiqiang
    Han, Xiaole
    Xi, Lifeng
    Erera, Alan L.
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (12) : 2915 - 2928
  • [23] Local branching-based algorithms for the disjunctively constrained knapsack problem
    Akeb, Hakim
    Hifi, Mhand
    Mounir, Mohamed Elhafedh Ould Ahmed
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 60 (04) : 811 - 820
  • [24] A simulation-based Genetic Algorithm approach for the quay crane scheduling under uncertainty
    Al-Dhaheri, Noura
    Jebali, Aida
    Diabat, Ali
    SIMULATION MODELLING PRACTICE AND THEORY, 2016, 66 : 122 - 138
  • [25] Decomposition algorithms for the robust unidirectional quay crane scheduling problems
    Li, Yitian
    Li, Xinyi
    Zhang, Canrong
    Wu, Tao
    COMPUTERS & OPERATIONS RESEARCH, 2024, 167
  • [26] A quay crane scheduling problem: a heuristic approach
    Yang, Kang-hung
    PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2010, : 254 - 258
  • [27] The Quay Crane Scheduling Problem with Time Windows
    Meisel, Frank
    NAVAL RESEARCH LOGISTICS, 2011, 58 (07) : 619 - 636
  • [28] The Quay Crane Scheduling Problem With Stability Constraints
    Zhang, Zizhen
    Liu, Ming
    Lee, Chung-Yee
    Wang, Jiahai
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2018, 15 (03) : 1399 - 1412
  • [29] An Integrated Quay Crane Assignment and Scheduling Problem
    Diabat, Ali
    Theodorou, Effrosyni
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 73 : 115 - 123
  • [30] Quay Crane Scheduling Problem with the Consideration of Maintenance
    Liu, Ming
    Liang, Bian
    Zheng, Feifeng
    Chu, Chengbin
    Chu, Feng
    2018 IEEE 15TH INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC), 2018,