Task assignment with multiskilled employees and multiple modes for product development projects

被引:5
|
作者
Hui Cheng
Xuening Chu
机构
[1] Shanghai Jiao Tong University,School of Mechanical Engineering
关键词
Task assignment; Product development project; Multiskilled employees; Multiple execution modes;
D O I
暂无
中图分类号
学科分类号
摘要
In a product development project, efficiently assigning tasks to employees is difficult, since high level of design imprecision and employees with multiple skills and different skill levels exist. The relative skill levels of employees are modeled by fuzzy numbers, and membership function is introduced to describe the confidential levels of the duration the task takes. The employees’ workloads in the project are calculated based on fuzzy sets theory and design structure matrix, and then multiple execution modes are generated by assigning different employees to the tasks. An optimization model of task assignment problem, which incorporates some factors not previously considered together (multiskilled employees and their skill levels, task iteration and the precedence constraints), is proposed. The objective function considered is to minimize the duration of the project and balance the workloads of the employees attending the project. Based on the information above, a genetic algorithm is utilized to find the optimum solution with regards to the considered objectives. A case of a die product development project is used to illustrate the problem and proposed method. The results verify the feasibility and effectiveness of this algorithm.
引用
收藏
页码:391 / 403
页数:12
相关论文
共 50 条
  • [1] Task assignment with multiskilled employees and multiple modes for product development projects
    Cheng, Hui
    Chu, Xuening
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (1-4): : 391 - 403
  • [2] Multiskilled Project Management Workforce Assignment across Multiple Projects Regarding Competency
    Sarihi, Mohsen
    Shahhosseini, Vahid
    Banki, Mohammad Taghi
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (12)
  • [3] Research on task intelligent assignment in the management of concurrent product development
    Han Xiangdong
    Liu Jiangang
    Liu Qi
    [J]. PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A AND B: BUILDING CORE COMPETENCIES THROUGH IE&EM, 2007, : 830 - 835
  • [4] Task allocation for product development projects based on the knowledge interest
    Gu, Mengyao
    Zheng, Juaner
    Hou, Pengfei
    Dai, Zhixi
    [J]. 2019 6TH INTERNATIONAL CONFERENCE ON INFORMATION SCIENCE AND CONTROL ENGINEERING (ICISCE 2019), 2019, : 600 - 604
  • [5] Team based labour assignment methodology for now product development projects
    Baysan, Serdar
    Durmusoglu, M. Bulent
    Cinar, Didem
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 106 : 83 - 104
  • [6] Multi-objective optimization for task assignment problem of product development
    [J]. Wu, Z.-Y. (wzhaoyun@163.com), 1600, Northeast University (27):
  • [7] Hierarchical Planning and Control Method for Multiple Product Development Projects
    Yin, Fu-peng
    Gao, Qi
    Fang, Dong
    [J]. PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: CORE THEORY AND APPLICATIONS OF INDUSTRIAL ENGINEERING (VOL 1), 2016, : 63 - 70
  • [8] Development, social norms, and assignment to task
    Fafchamps, Marcel
    [J]. PROCEEDINGS OF THE NATIONAL ACADEMY OF SCIENCES OF THE UNITED STATES OF AMERICA, 2011, 108 : 21308 - 21315
  • [9] Multi-objective task assignment optimization method for largescale engineering projects under multiple work calendars
    Zeng Q.
    Yuan M.
    Zhang J.
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (05): : 1223 - 1237
  • [10] Market-based collaborative control of distributed multiple product development projects
    Lee, YH
    Kumara, SRT
    [J]. NETWORK INTELLIGENCE: INTERNET-BASED MANUFACTURING, 2000, 4208 : 73 - 83