Team based labour assignment methodology for now product development projects

被引:8
|
作者
Baysan, Serdar [1 ]
Durmusoglu, M. Bulent [1 ]
Cinar, Didem [1 ]
机构
[1] Istanbul Tech Univ, Fac Management, Dept Ind Engn, Istanbul, Turkey
关键词
Product development; Teams; Lean; Value stream mapping; Design structure matrix; Simulation; DEVELOPMENT CYCLE TIME; SIMULATION-BASED OPTIMIZATION; EFFECTIVE WORKER TEAMS; GENETIC ALGORITHM; GROUP-TECHNOLOGY; RESOURCE CONSTRAINTS; SCHEDULING PROJECTS; ASSEMBLY SYSTEMS; DESIGN PROCESS; LEAD-TIME;
D O I
10.1016/j.cie.2016.11.032
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This study explores the organizational aspects of new product development projects and proposes a new team-based labour assignment methodology. The proposed hierarchical methodology focusses on the project value stream and aims to shorten lead time through waste reduction. Lean product development tools, such as clustering and design structure matrix tools, are integrated with the methodology. A detailed real-life case study is presented and the proposed methodology is evaluated using discrete event simulation. Experiment results show that the proposed methodology and team-based structure provide superior lead time performance when compared to conventional organizational setting. This study contributes to existing literature by presenting evidence of the effect of teams on NPD lead time performance. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:83 / 104
页数:22
相关论文
共 50 条
  • [1] Team Foresight in New Product Development Projects
    Atif Açıkgöz
    Ayşe Günsel
    Cemil Kuzey
    Halil Zaim
    [J]. Group Decision and Negotiation, 2016, 25 : 289 - 323
  • [2] Team Foresight in New Product Development Projects
    Acikgoz, Atif
    Gunsel, Ayse
    Kuzey, Cemil
    Zaim, Halil
    [J]. GROUP DECISION AND NEGOTIATION, 2016, 25 (02) : 289 - 323
  • [3] Methodology for Determining Agile Product Scopes in Development Projects
    Schuh, G.
    Doelle, C.
    Diels, F.
    Kuhn, M.
    [J]. 2018 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING AND TECHNOLOGY (PICMET '18): MANAGING TECHNOLOGICAL ENTREPRENEURSHIP: THE ENGINE FOR ECONOMIC GROWTH, 2018,
  • [4] Formal controls and team adaptability in new product development projects
    Detzen, Nina
    Verbeeten, Frank H. M.
    Gamm, Nils
    Moller, Klaus
    [J]. MANAGEMENT DECISION, 2018, 56 (07) : 1541 - 1558
  • [5] Antecedents and consequences of team sensemaking capability in product development projects
    Akgun, Ali E.
    Keskin, Halit
    Lynn, Gary
    Dogan, Derya
    [J]. R & D MANAGEMENT, 2012, 42 (05) : 473 - 493
  • [6] Antecedents and consequences of team reflexivity in new product development projects
    Dayan, Mumin
    Basarir, Aydin
    [J]. JOURNAL OF BUSINESS & INDUSTRIAL MARKETING, 2010, 25 (1-2) : 18 - 29
  • [7] Team Performance and Its Influential Factors: An Empirical Study Based on Creative Product Development Projects
    Mo Yan
    Luo Yicheng
    [J]. PROCEEDINGS OF THE TENTH WEST LAKE INTERNATIONAL CONFERENCE ON SMALL & MEDIUM BUSINESS, VOLS I AND II, 2008, : 777 - 780
  • [8] Task assignment with multiskilled employees and multiple modes for product development projects
    Hui Cheng
    Xuening Chu
    [J]. The International Journal of Advanced Manufacturing Technology, 2012, 61 : 391 - 403
  • [9] Task assignment with multiskilled employees and multiple modes for product development projects
    Cheng, Hui
    Chu, Xuening
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (1-4): : 391 - 403
  • [10] Labour ward team training - where are we now?
    Donald, Fiona
    [J]. INTERNATIONAL JOURNAL OF OBSTETRIC ANESTHESIA, 2016, 25 : 1 - 3