共 50 条
- [42] Research on the multi-project task scheduling under multi-resource constraints Harbin Gongye Daxue Xuebao, 2007, 7 (1045-1049):
- [44] Scheduling and optimal voltage selection with multiple supply voltages under resource constraints VLSI'03: PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON VLSI, 2003, : 272 - 278
- [46] Unrelated parallel machine scheduling with secondary resource constraints INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 26 (03): : 285 - 292
- [47] Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application Eur J Oper Res, 1 (88-110):
- [48] Unrelated parallel machine scheduling with secondary resource constraints The International Journal of Advanced Manufacturing Technology, 2005, 26 : 285 - 292