Multiple machine continuous setup lotsizing with sequence-dependent setups

被引:0
|
作者
Bernardo Almada-Lobo
Diego Klabjan
Maria Antónia Carravilla
José F. Oliveira
机构
[1] DEIG—Faculdade de Engenharia da Universidade do Porto,Department of Industrial Engineering and Management Sciences
[2] Northwestern University,Faculdade de Engenharia
[3] da Universidade do Porto,undefined
[4] Instituto de Engenharia de Sistemas e Computadores do Porto Campus da FEUP,undefined
关键词
Continuous setup lotsizing; Sequence-dependent setup; Integer programming; Lagrangian decomposition; Heuristics;
D O I
暂无
中图分类号
学科分类号
摘要
We address the short-term production planning and scheduling problem coming from the glass container industry. A furnace melts the glass that is distributed to a set of parallel molding machines. Both furnace and machine idleness are not allowed. The resulting multi-machine multi-item continuous setup lotsizing problem with a common resource has sequence-dependent setup times and costs. Production losses are penalized in the objective function since we deal with a capital intensive industry. We present two mixed integer programming formulations for this problem, which are reduced to a network flow type problem. The two formulations are improved by adding valid inequalities that lead to good lower bounds. We rely on a Lagrangian decomposition based heuristic for generating good feasible solutions. We report computational experiments for randomly generated instances and for real-life data on the aforementioned problem, as well as on a discrete lotsizing and scheduling version.
引用
收藏
页码:529 / 552
页数:23