Improved and competitive algorithms for large scale multiple resource-constrained project-scheduling problems

被引:0
|
作者
Mohammad Rostami
Dariush Moradinezhad
Azadeh Soufipour
机构
[1] University of Science and Technology,Dept. of Industrial Engineering
[2] Western Michigan University,Dept. of Industrial & Manufacturing Engineering
来源
关键词
multiple-resource constrained; branch and bound; project scheduling problem; genetic algorithm; heuristic method;
D O I
暂无
中图分类号
学科分类号
摘要
Project scheduling using several resource constraints has been considered frequently by scholars in literatures, but when the dimensions of the problem is getting bigger those solution methods have not high efficiency. The objective of this paper is to propose a branch and bound algorithm and also an enhanced and competitive genetic algorithm to solve the problem of project scheduling with large scale and multiple resource-constrained. The aim of the model is to minimize the project’s completion time which is the objective of all employees. The proposed genetic algorithm in comparison with other meta-heuristic algorithms in the literature has been improved in order to solve larger scale problems easier and with less error. Also the branch and bound algorithm has the ability to solve the large scale problems in a short time using an appropriate upper and lower bound. In this algorithm, an upper bound heuristic that solves the problem with subtle error is proposed. This method is being used to faster prune the answer tree. Also a lower bound based on the solution of a Linear Programming (LP) model has been proposed that has high computational speed as well as tight that makes the solution of large scale problems possible. Computational results are also reported for the most known benchmark problems taken from the operational research literature. These results show that the improved GA in this paper is capable of solving the majority of the problems with less error than other metaheuristic methods. Especially in problems with 120 activities, this algorithm on average has 10% less error than the best existing metaheuristic method. Also the proposed B&B algorithm is capable of solving problems with more than 50 activities in a short time, while the existing algorithms could solve the problems with up to 50 activities so far.
引用
收藏
页码:1261 / 1269
页数:8
相关论文
共 50 条
  • [31] Handling Alternative Activities in Resource-Constrained Project Scheduling Problems
    Kuster, Juergen
    Jannach, Dietmar
    Friedrich, Gerhard
    20TH INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE, 2007, : 1960 - 1965
  • [32] Consolidated optimization algorithm for resource-constrained project scheduling problems
    Elsayed, Saber
    Sarker, Ruhul
    Ray, Tapabrata
    Coello Coello, Carlos
    INFORMATION SCIENCES, 2017, 418 : 346 - 362
  • [33] A New MBS Representation for Resource-Constrained Project Scheduling Problems
    Hao, Xingxing
    Liu, Jing
    2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, : 217 - 224
  • [34] A novel multiple decision-maker model for resource-constrained project scheduling problems
    Ma, Yanfang
    Xu, Jiuping
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2014, 41 (06) : 500 - 511
  • [35] Review of Resource-Constrained Scheduling Algorithms
    Franco-Duran, Diana M.
    de la Garza, Jesus M.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (11)
  • [36] Resource-constrained project scheduling and timetabling
    Brucker, P
    Knust, S
    PRACTICE AND THEORY OF AUTOMATED TIMETABLING III, 2001, 2079 : 277 - 293
  • [37] A tool to test and validate algorithms for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 118 : 251 - 265
  • [38] Optimization algorithms for solving resource-constrained project scheduling problem: A review
    Liu, Shi-Xin
    Wang, Meng-Guang
    Tang, Jia-Fu
    Kongzhi yu Juece/Control and Decision, 2001, 16 (SUPPL.): : 647 - 651
  • [39] Improved genetic algorithm for resource-constrained scheduling of large projects
    Kim, Jin-Lee
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2009, 36 (06) : 1016 - 1027
  • [40] Chaos-based improved immune algorithm (CBIIA) for resource-constrained project scheduling problems
    Wu, Shanshan
    Wan, Hung-Da
    Shukla, Sanjay Kumar
    Li, Beizhi
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (04) : 3387 - 3395